<br />trees, <br />In some cases it may be better to move the pipe rather than the tree. As directed by the <br />Engineer. <br /> <br />38. Is there going to be variance on this project? You have an item 500 linear feet stakes/fence <br />buried in that item. <br />Staked silt fence will be used around well and trench construction areas as needed. <br />Floating silt barriers will be used during construction at existing outfalls to the bay. <br /> <br />39. Do you have an area set aside for a staging area? <br />Contractor must provide its own staging area. <br /> <br />40. Do you have an area set aside for a field office? <br />The City does not have an area set aside for field office. <br /> <br />41. What about clearing and grubbing, is it by the acre, 14 acres? <br />Clearing and Grubbing was deleted. However, pay items were added. <br /> <br />42. Will it be better to pay as a lump sum for the clearing and grubbing, it is going to be a <br />breaker item. What is the government standard for that? <br />Clearing and Grubbing 'was deleted. However, pay items ,,,ere added. <br /> <br />43. If school is not done by January, will there be a conflict for closing road? <br />Use alternate access to the site. Contractor will address this issue on its work schedule. <br /> <br />44. Crossings, does the contractor get paid for limerock used? <br />Limerock will be paid when used as base material. Also, use limerock for Item] 02.3 <br />Commercial Material for Driveway Repair. <br /> <br />45. Will the City be looking for trench backfill? <br />Trench backfill is indicated as a part of unit price for sewers. <br /> <br />46. On the backfill will the contractor be able to utilize material for trench backfill? <br />Trenches shall be backfilled with suitable material. Sheet # 39. indicate the type of <br />existing subsoil configuration. <br /> <br />47. The cost of rock has been changing quite a bit, any way to compensate for raise in price? <br />NO. <br /> <br />48. Limerock, measured compact and ready? <br />YES. <br /> <br />49. Will there be a line item considered for sidewalks where light poles are in the middle of the <br />sidewalk? <br />Box concrete around pole. <br /> <br />50. What is the intent for existing drainage lines? <br />As general information. <br /> <br />Bid 07-10-02 Pre-Bid Conference QA (2) <br /> <br />Page 5 of 6 <br />