Laserfiche WebLink
<br />) <br /> <br />SECTION 00300 <br /> <br />BID FORM <br />Bid of (Name of Bidder) ~ C'ons1l1Achon CO" InL . <br />Address \:4tsD N . uJ. 'Si>u.+h Rlv( ( D 11 ve <br />IV\lUml~ Flu. ~311B <br />Phone (?;()S)fft/!J.Ct'(J7f) Fax: (.wi) 003.9075 <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with the Contract <br />Documents for construction of: CENTRAL ISLAND DRAINAGE AND STREETS IMPROVEMENTS <br />located in the CITY OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work <br />and is familiar with the nature and extent of the work and any local conditions that may in any manner <br />affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding <br />Documents, in the manner prescribed therein and to the standards of quality and performance established <br />by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or <br />combination of items stipulated. Unit price line items shall include cost of implementing all applicable <br />safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the <br />sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual <br />quantities required may increase or decrease. Bidder further agrees that payments will be made on the <br />basis of actual quantities placed and accepted in the construction <br /> <br /> UNIT BID PRICE SCHEDULE <br /> Unit <br />Item No. Description Estimated Unit Price Amount <br /> Quantity <br /> US$ US$ <br />101-1 Mobilization 1.0 LS 4Sl QIo.DO 4SD Q:)O. 00 <br />102-1 Maintenance of Traffic 365 LS/Da (,'2C.oo 'Z 74,300.0 <br />102-3 Commercial Material for Driveway 500 CY ~B . 00 14-.000.00 <br />102-14 Traffic Control Officer 200 MH 42.00 ~ 400.00 <br />102-61 Project Sign, (see Special Provisions) 3 Ea '100. d) 2.7DO.co <br />102-71-11 Barrier Wall (temporary) 100 LF -e6. Do ?>. 9)1J.00 <br />102-71-21 Barrier Wall (relocation) 300 LF 2O.CX> {,..OOO.OO <br />1 04-13-1 Staked Silt Fence 500 LF ~.co l. SllD.OO <br />1 09-71-1 Field Office (300 SF Min.) 365 Da "4-.00 2"3 3~.co <br />11 0-3-7 Removal and Disposal of DrainaQe Structures 20 EA ~.()O , 8"0.00 <br /> Removal of Existing Concrete Sidewalk (4" and . <br />11 0-4-1 6" Thick Included) 1,298 SY 18.f)D ~~ *4.00 <br />110-4-1-1 Removal and Disposal of Existing Curb and Gutter 1,519 SY la.oD 15.lqb.OD <br /> <br />Oct. 2007 <br /> <br />00300-1 <br /> <br />\ \ L\ <br />1 rc\ \ <br />