Laserfiche WebLink
<br />48. Limerock, measured corn pact and ready? <br />YES. <br /> <br />49. Will there be a line item considered for sidewalks where light poles are in the middle of the <br />sidewalk? <br />Box concrete around pole. <br /> <br />50. What is the intent for existing drainage lines? <br />As general infor'mation. <br /> <br />51. If contractor finds a drainage pipe and it is not in specs will it be left alone? <br />YES. Unless otherwise indicated by the engineer. <br /> <br />52. All existing pipes in specs to be removed or abandoned? If not specified should it be left <br />untouched? <br />YES, Unless otherwise indicated by the engineer. <br /> <br />53. Will contractor be cutting and gutting pipes in specs? <br />YES. <br /> <br />54. When will addendum be issued? <br />In approximately five (5) days along with copies of the sign-in sheets, and summar'y <br />minutes of today's meeting. <br /> <br />55. Any known utility conflicts? <br />NO, no known conflicts. <br /> <br />The Pre-Bid Conference was concluded at II: 10 a.m. <br /> <br />List of Plans dated 11-7-07, revised as per Addendum No.1 <br /> <br />. General Notes and Miscellaneous Details Sheet 5 <br />. Summary of Quantities Sheet 6 <br />. Plan and Profile North Bay Road Sheet 11 <br />. Plan and Profile North Bay Road Sheet 15 <br />. Plan and Profile North Bay Road Sheet 16 <br />. Plan and Profile NE 175/" Terrace Sheet 19 <br />. Plan and Profile NE 178''' Dr. Sheet 24 <br />. Plan and Profile NE 178''' Dr. Sheet 25 <br />. Plan and Profile Church Dr. Sheet 26 <br />. Plan and Profile NE 177" Dr. Sheet 27 <br />. Plan and Profile NE 18(/" Dr. Sheet 30 <br />. Plan and Profile NE 18(/" Dr. Sheet 31 <br />. Plan and Profile NE 181"'/ Dr. Sheet 32 <br />. Drainage Structures Sheet 34 <br />. Drainage Structures Sheet 35 <br />Bid 07.10-02 Pre-Bid Conference QA (2).doc Page 6 of 7 <br />