Laserfiche WebLink
<br />-{ :I <br /> <br />SECTION 00300 <br /> <br />BID FORM <br /> <br />Bid of (Name of Bidder) COMMUNITY ASPHALT CORP. <br />JLj()()J Ntv / j(p +1; :5+- <br />Ma/eCl~ IF/ 330/y <br />Phone 3 0 r:. 8'J'1-()-1O 0 Fax: 8o~ ~ ;:;9- fiN- ".) <br /> <br />Address <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with the Contract <br />Documents for construction of: CENTRAL ISLAND DRAINAGE AND STREETS IMPROVEMENTS <br />located in the CITY OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work <br />and is familiar with the nature and extent of the work and any local conditions that may in any manner <br />affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding <br />Documents, in the manner prescribed therein and to the standards of quality and performance established <br />by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or <br />combination of items stipulated. Unit price line items shall include cost of implementing all applicable <br />safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the <br />sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual <br />quantities required may increase or decrease. Bidder further agrees that payments will be made on the <br />basis of actual quantities placed and accepted in the construction <br /> <br /> UNIT BID PRICE SCHEDULE <br /> Unit <br />Item No. Description Estimated Unit Price Amount <br /> Quantit <br />101-1 Mobilization 1.0 LS <br />102-1 Maintenance of Traffic 365 LS/Da <br />102-3 Commercial Material for Drivewa 500 CY <br />102-14 Traffic Control Officer 200 MH <br />102-61 Pro'ecl Si n, see S ecial Provisions 3 Ea <br />102-71-11 Barrier Wall tem orar 100 LF <br />102-71-21 Barrier Wall (relocation) 300 LF <br />1 04-13-1 Staked Silt Fence 500 LF <br />1 09- 71-1 Field Office (300 SF Min.) 365 Da <br />110-3-7 Removal and Dis osal of Draina e Structures 20 EA <br /> Removal of Existing Concrete Sidewalk (4" and <br />11 0-4-1 6" Thick Included) 1,298 SY <br />110-4-1-1 Removal and Dis osal of Existin Curb and Gutter 1,519 SY <br />Oct. 2007 <br /> 00300-1 <br /> <br />