My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Man-Con, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Responses
>
Man-Con, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:46 PM
Creation date
8/13/2008 2:28:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />J <br />i <br />i <br />t <br />t <br />I <br />i <br />I <br />i <br />~ <br />~ <br />I <br />I <br />~ <br />! <br />S <br />! <br /> <br />i <br />.. <br /> <br />i <br />.. <br /> <br />! <br /> <br />~ <br />t <br />~ <br />~ <br />~ <br />~ <br />! <br />! <br />~ <br /> <br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of FIOlida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the Total Bid Price <br />are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October L <br />1990. The bidder further identifies the costs of such compliance to be summarized below: <br /> <br />Trench Safety <br />Measure <br />(Description) <br /> <br />Unit of <br />Measure <br />(LFSF) <br /> <br />l-~ <br /> <br />S~ <br /> <br />Unit Unit Extended <br />(Quantity) Cost Cost <br />~t..1> 3.00 Z~ n '7CJ . c::> 0 <br />.- .I <br />4DOV I tJ. Pt!/ 1'a ""' nn 00 <br /> '/ <br /> <br />A. -r~.jtj~ ~)./; eL.!:> <br />B. t.il~~.-,. /~ ""ita ~ <br />/ <br /> <br />C. <br />D. <br /> <br />Total $ <br /> <br />CI'C- ~ ?9,oG> <br />/ <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in excess of five <br />feet in depth shall be in accordance with the Florida Department of Transportation's Special Provisions <br />Article 125-1 and Sub-article 125-4.1 (TRENCH EXCAVATION SAFETY SYSTEM AND <br />SHORING, SPECIAL - TRENCH EXCAVATION). <br /> <br />Failure to complete the above may result in the bid being declared non-responsive. <br /> <br />Contractor agrees that the above safety compliances and costs are inc uded in his bid package. <br /> <br /> <br />END OF DOCUMENT <br /> <br />Oct. 2007 <br /> <br />00403-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.