My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />I. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Delete Paragraph 2.03. and replace with the foJJowing: <br /> <br />"The date of commencement of the Work is the date established in a Notice to Proceed." <br /> <br />Add the following to Paragraph 2.05.: <br /> <br />"D. CONTRACTOR shall perform no portion of the Work at any time without Contract <br />Documents or, where specified, approved Shop Drawings for such portion of the Work. <br /> <br />E. By executing the Contract, CONTRACTOR represents that he has visited the site. <br />familiarized himself with the local conditions under which the Work is to be performed. and cor- <br />related his observations with the requirements of the Contract Documents." <br /> <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE <br /> <br />Add the following to Paragraph 3.02.A.: <br /> <br />"3. Sections of Division One - General Requirements govern the execution of all sections of the <br />Specifications." <br /> <br />ARTICLE 4 - A V AILABILITY OF LANDS; SUBSURFACE AND <br />PHYSICAL CONDITIONS: REFERENCE POINTS <br /> <br />In Paragraph 4.02.A., change the term" ...Supplementary Conditions..." to read: <br /> <br />" .. .bidding requirements..." . <br /> <br />LI Paragraph 4.02.B., change the term "Supplementary Conditions..." to read: <br /> <br />"...bidding requirements...". <br /> <br />ARTICLE 5 - BONDS AND INSURANCE <br /> <br />In the first line of Paragraph 5.04., foJJowing the word "...maintain...", insert the words: <br /> <br />" ... in a company or companies licensed to do business in the State of Florida,...". <br /> <br />In the last line of Paragraph 5.04.A.6., foJJowing the word "...vehicle.", insert the words: <br /> <br />". .., or arising out of operation of laws and regulations for damages because of bodily injury or <br />death of any person or for damage to property." <br /> <br />Add the following after Paragraph 5.04.B.7.: <br /> <br />8. Include all major divisions of coverage and be on a comprehensive basis including: <br /> <br />1. Premises Operations (including X, C and U coverages as applicable. <br />ii. Independent contractor's Protective. <br />111. Products and Completed Operations. <br />IV. Personal Injury Liability with Employment Exclusion deleted. <br /> <br />I Oct. 2007 SUPPLEMENTARY CONDITIONS <br /> <br />00800-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.