My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />Documents. -When the Contractor considers a portion substantially complete, the Contractor <br />shall prepare and submit a comprehensive list to the Engineer of the items to be completed or <br />corrected prior to final payment. The Failure to include an item on such list does not alter the <br />responsibility of the Contractor to complete all Work in accordance with the Contract <br />Documents. Consent of the Contractor to partial occupancy or use shall not be unreasonably <br />withheld. The stage of the progress of the Work shall be determined by written agreement <br />between the Ovmer and the Contractor, or if no agreement is reached, by decision of the <br />Engineer. <br /> <br />B. Immediately or prior to such partial occupancy or use, the Owner, Contractor, and Engineer <br />shall jointly inspect the area to be occupied or the portion of the Work to be used in order to <br />determine and record the condition of the Work. <br /> <br />C. Unless otherwise agreed upon, partial occupancy or use of a portion or portions of the Work <br />shaJl not constitute acceptance of the Work not complying with the Contract Documents." <br /> <br />After the least sentence in Paragraph 14.04.B, insert the foJlowing: <br /> <br />"c. Once 1) the definitive certificate of completion has been issued to the Owner and the Contractor and <br />2) once consent of the surety, if any, has been obtained, the Owner shaJl make payment of Retainage <br />applying to such Work or designated portion thereof. Such payment shaJl be adjusted for Work that is <br />incomplete or not in accordance with the requirements of the Contract Documents." <br /> <br />Delete Paragraph 14.07.A.2 and 1 4.07 .A.3 insert the foJlowing: <br /> <br />"The final Application for Payment shaJl be accompanied (except as previously delivered) by: <br />(1) an affidavit that payroJls, biJls for materials and equipment, and other indebtedness connected <br />with the Work for which the Owner or the Owner's property might be responsible or <br /> <br />encumbered (less amounts \vithheld by O\vner) have been paid or otherNise been satisfied. (2) a <br /> <br />certificate evidencing that insurance required by the Contract Documents to remain in force after <br />final payment is currently in effect and will not be canceled or aJlowed to be expired until at least <br />30 days' prior written notice has been given to the Owner, (3) a written statement that the <br />Contractor knows of no substantial reason that the insurance wiJl not be renewable to cover the <br />period required by the Contract Documents, (4) consent of the surety, if any, to final payment. <br />and (5) if required by the Owner. other data establishing payment or satisfaction of obligations, <br />such as receipts, releases, and waivers of liens, claims, security interests of encumbrances arising <br />out of the Contract, to the extent and in such form as may be designated by the Owner. (6) all <br />documentation as required by the Contract Documents, and (7) acceptance by the Owner and <br />governing agencies. If a Subcontractor refuses to furnish a release or waiver required by the <br />Owner, the Owner may require that the Contractor furnish a bond or other coJlateral satisfactory <br />to the Owner to indemnify the Owner against such lien. If such lien remains unsatisfied after <br />payments are made, the Contractor shaJl refund to the Owner all money that the Owner may be <br />compeJled to pay in discharging the lien, including aJl reasonable attorneys' fees and costs. The <br />final payment wiJl become due when the Contractor submits the information above to the <br />Engineer." <br /> <br />ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION <br /> <br />Paragraph l5.02.B., insert the foJlowing after the words...such excess...; ": <br /> <br />I Oct. 2007 SUPPLEMENTARY CONDITIONS <br /> <br />00800-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.