My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />DIVISION II <br />SPECIAL PROVISIONS <br /> <br />1. <br /> <br />General: <br /> <br />The applicable portions of the 2004 Edition of the FLORIDA DEPARTMENT OF <br />TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE <br />CONSTRUCTION and its supplements as amended by the General Specifications and the following <br />Special Provisions, and the, the applicable portions of the SOUTH FLORIDA BUILDING CODE and <br />the PUBLIC WORKS MANUAL OF MIAMI-DADE COUNTY Part 1 and II, shall apply to this <br />project. All are hereby made a part ofthis Contract. <br /> <br />Unless otherwise noted, all page references in the Special Provisions refer to the FLORIDA <br />DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS FOR ROAD AND <br />BRIDGE CONSTRUCTlON, 2004 edition. <br /> <br />2. <br /> <br />Location of Work: <br /> <br />The location where the work is to be performed shall be in the City of Sunny Isles Beach, Central <br />Island neighborhood, between Collins Avenue (SR AlA) and the Intracoastal Waterway and NE <br />1 74th Street and NE l82nd Street (non-included). The exact location and limits of construction are <br />shown in the Plans accompanying these Contract Documents. <br /> <br />3. <br /> <br />Scope of Work: <br /> <br />The project consists of construction of the storm sewer system throughout the Central Island <br />neighborhood as indicated on the construction plans; sub-surface drainage; drainage wells (deep <br />wells), pavement milling and resurfacing; pavement overbuilt and resurfacing; street widening, <br />pavement markings and signing; tree relocation and misceiianeous tasks to complete the work. <br /> <br />4. <br /> <br />Plans: <br /> <br />The plans accompanying these Contract Documents are entitled: "CENTRAL ISLAND DRAINAGE <br />AND STREET IMPROVEMENTS" prepared for, THE CITY OF SUNNY ISLES BEACH, October, <br />2007 <br /> <br />5. <br /> <br />Limitation of Operations: <br /> <br />Section 8-4.1 - Night Work: Add the following to this sub article: <br /> <br />No work shall be done at all on Saturday, Sunday and designated holidays or any day between the <br />hours of 5 :00 p.m. and 8 :00 a.m., except such work as is necessary for the proper care and protection <br />of the work already performed, or, except that permission to do such work may be secured from the <br />Engineer. <br /> <br />6. <br /> <br />Project Si2n: <br /> <br />The Contractor shall construct three (3) "PROJECT SIGNS" (4' x 8' in size) in accordance with a <br />sketch to be provided by the City. The signs shall be constructed of l/2-inch Marine Plywood, <br />framed. with supports to be anchored to the ground, newly painted and lettered according to the <br />sketch. <br /> <br />Oct. 2007, Special Provisions <br /> <br />Page 1 of I 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.