My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-02) Central Island Drainage
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:47 PM
Creation date
8/14/2008 11:37:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Central Island Drainage and Street Improvements
Bid No. (xx-xx-xx)
07-10-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />full compensation for: (1) furnishing. (2) installation, (3) routine maintenance, and (4) removal upon <br />completion and final acceptance of the work specified under the terms of this Contract. <br /> <br />Note: Particular attention should be given that in case of repeated pollution, or silting, the City <br />reserves the right to employ outside assistance or to use City forces to provide the necessary <br />corrective measures. Any such costs incurred, including the engmeering costs will be charged to the <br />contractor and appropriate deductions made from the monthly progress estimate. <br /> <br />22. <br /> <br />Clearing and Grubbing (Item No. 110-1) <br /> <br />The contract unit price bid as indicated in the Bid Form of the Proposal shall be fuJ1 compensation for <br />all work required for Clearing and Grubbing; including, but not limited to, removal of asphalt <br />pavement, tree removal, trash, debris, tree trimming, removal of drainage structures, and plugging of <br />existing drainage system left in place, among others, within the entire length of the project. <br /> <br />23. <br /> <br />Earthwork Related Operations (Section 120) <br /> <br />23.01 Grading <br /> <br />The Contractor shall include the cost of all grading in the unit price bid for the appropriate items. <br />Any additional grading required within the limits of the project, should be included in the clearing <br />and grubbing pay item. No separate payments will be made for any grading required on this project. <br /> <br />23.02 Regular Excavation (Item No. 120-1) <br /> <br />Regular Excavation shall consists of the excavation and the utilization, and satisfactory disposal, of <br />all materials necessary for street widening, side ditches, and lateral ditches, within the right-of-way. <br />except as may be specificaJJy shown to be paid for separately. <br /> <br />24. <br /> <br />Stabilizing (Section 160) <br /> <br />Section 160 STABILIZING: Delete the words "Bearing Value" or "Limerock Bearing Ratio Method" <br />where they occur throughout this section and substitute the words "California Bearing Ratio". <br /> <br />Delete all contrary references to density requirements and substitute the following: <br /> <br />Compaction - The density requirements for all, street widening and sub grade involved in this Section <br />shall be a minimum ninety- five percent (95%) for non-roadway areas and ninety-eight percent (98%) <br />for roadway areas (street widening), of maximum density as determined by AASHTO T -180. Delete: <br />"do not apply density requirements where constructing narrow widening strips 4 feet or less" <br />from section 120-9.4 <br /> <br />Delete all mention of Bearing Value requirements entirely and substitute the following: <br /> <br />California Bearing Ratio Requirements: Suitability of the soil to be compacted shaJ1 be determined by <br />the California Bearing Ratio Test as outlined in ASTM D 1883-87. Tests shall be made on each <br />separate course, generally before the materials have been compacted. <br /> <br />Any areas where the materials have a C.B.R. value ofless than Thirty (30) at ninety-five (95) percent <br />ofthe maximum density as determined by AASHTO T-180 shall be stabilized (or further stabilized) <br /> <br />Oct. 2007, Special Provisions <br /> <br />Page 7 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.