Laserfiche WebLink
<br />existing subsoil configuration. <br /> <br />47. The cost ofrock has been changing quite a bit, any way to compensate for raise in price? <br />NO. <br /> <br />48. Limerock, measured compact and ready? <br />YES. <br /> <br />49. Will there be a line item considered for sidewalks where light poles are in the middle of the <br />sidewalk? <br />Box concrete around pole. <br /> <br />50. What is the intent for existing drainage lines? <br />As general information. <br /> <br />51. If contractor finds a drainage pipe and it is not in specs will it be left alone? <br />YES. Unless othenvise indicated by the engineer. <br /> <br />52. All existing pipes in specs to be removed or abandoned? If not specified should it be left <br />untouched? <br />YES, Unless othenvise indicated by the engineer. <br /> <br />53. Will contractor be cutting and gutting pipes in specs? <br />YES. <br /> <br />54. When will addendum be issued? <br />In approximately five (5) days along with copies of the sign-in sheets, and summary <br />minutes of today's meeting. <br /> <br />55. Any known utility conflicts? <br />NO, no known conflicts. <br /> <br />The Pre-Bid Conference was concluded at 11: 10 a.m. <br /> <br />List of Plans dated 11-7-07, revised as per Addendum No.1 <br /> <br />. General Notes and Miscellaneous Details <br />. Summary of Quantities <br />. Plan and Profile North Bay Road <br />. Plan and Profile North Bay Road <br />. Plan and Profile North Bay Road <br />. Plan and Profile NE 1751" Terrace <br />. Plan and Profile NE 17tf" Dr. <br />. Plan and Profile NE 1781" Dr. <br />. Plan and Profile Church Dr. <br />. Plan and Profile NE 171" Dr. <br /> <br />Sheet 5 <br />Sheet 6 <br />Sheet 11 <br />Sheet 15 <br />Sheet 16 <br />Sheet 19 <br />Sheet 24 <br />Sheet 25 <br />Sheet 26 <br />Sheet 27 <br /> <br />Bid 07-10-02 Prc-Bid Confcrcncc Q1\ (2) <br /> <br />Pagc 6 of 7 <br />