Laserfiche WebLink
<br /> x $ $ <br />B8 One Irrigation Laborer 50 Hours 3-=t . So \; s -:res <br />(All other times) <br /> Per Hour = <br /> $ <br />B SUBTOTAL ~\ SoD <br /> , <br />c. EQUIPMENT <br /> X $ Coo . 00 $ <br />Cl One Front End Loader with Backhoe, 250 Hours t':> (:)00 <br />including an Operator / <br /> Per Hour = <br /> X $ $ <br />C2 One Front End Loader with Backhoe, 30 Days '\: <ba. 0" l '-\ l.\.. 0 0 <br />including an Operator , <br /> Per Day = <br /> X $ d,\..\.OO. 90 $ <br />C3 One Front End Loader with Backhoe, 4 Weeks '1 '.0'00 <br />including an Operator I <br /> Per Week = <br /> X $ $ <br /> One Front End Loader with Backhoe, \0 l\. 00, Q Q \'0 ~C)O <br />C4 1 Month <br />including an Operator / f <br /> Per Month = <br /> X $ ~S. ?"" $ <br />C5 One 15,000 GVW (or larger) Dump 100 Hours ~{'SOO <br />Truck with an Operator <br /> Per Hour = <br /> X $ 0':> $ <br />C6 One 15,000 GVW (or larger) Dump 10 Days )gO. ~{'?()O <br />Truck with an Operator <br /> Per Day = <br /> X $ $ <br /> One 15,000 GVW (or larger) Dump \'-\.00. '):1 \{'\OO <br />C7 1 Week <br /> Truck with an Operator I <br /> Per Week = <br /> X $ $ <br />C8 One 15,000 GVW (or larger) Dump 1 Month ~ 0\0\0 Co O~\O <br />Truck with an Operator I f <br /> Per Month = <br /> One Trailer Mounted Water Tank (500 X $ $ <br />C9 gallon minimum) with Pump and Hose 20 Days d~O S {.oOO <br /> Reel I <br /> Per Day = <br /> One Trailer Mounted Water Tank (500 X $ $ <br />C10 gallon minimum) with Pump and Hose 2 Weeks \/~OO. d.{rooo <br /> Reel Per Week = <br /> One Trailer Mounted Water Tank (500 X $ $ <br /> ~ (O\o6 Co t> \0\0 <br />Cll gallon minimum) with Pump and Hose 1 Month f <br /> Reel Per Month = <br /> <br />PAGE 31 OF 92 <br />BID No. 07-10-04 <br />