My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Superior Landscaping and Lawn Service, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-04) Landscaping Maintenance Services
>
Responses
>
Superior Landscaping and Lawn Service, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:49 PM
Creation date
8/14/2008 10:52:04 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Services
Bid No. (xx-xx-xx)
07-10-04
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> x $ {,Z-.~ $ <br />H1S 174th Street 52 Weeks '1.1> .~ <br />(400 street address) <br /> Per Week = <br /> X $ $ <br />H16 174th Street at Collins Avenue 52 Weeks ~, t:: 1,,:1' > ' c-"() <br />(north side) <br /> Per Week = <br /> X $ $ <br />H17 17Sth Drive at 17Sth Street 52 Weeks 'z;{ 1.13>,<}O <br /> ~. <br /> Per Week = <br /> X $ $ <br />H18 17Sth Street at 17Sth Drive 52 Weeks 0{ . l.,? Z. '13. an <br /> Per Week = <br /> X $ .(.z-:[ $ <br />H19 North Bay Road at 174th Street 52 Weeks 2 -::f3 . (jQ <br />(east side) <br /> Per Week = <br /> X $ {,z,~ $ <br />H2O North Bay Road at 174th Street 52 Weeks 2"1 ~ . ()O <br />(west side) <br /> Per Week = <br /> X $ <;. 0~ $ <br />H21 North Bay Road at 17Sth Drive 52 Weeks 2f~.(Jb <br />(east side) <br /> Per Week = <br /> X $ $ <br />H22 North Bay Road at 17Sth Drive 52 Weeks '{ , ''L ':f 2-T5,(Jl) <br />(west side) <br /> Per Week = <br /> X $ S . 2-<1' $ <br />H23 Atlantic Boulevard at lS0th Street 52 Weeks Z. 1-~. <fD <br />(east side) <br /> Per Week = <br /> X $ $ <br />H24 Atlantic Boulevard at 191 st Street 52 Weeks .; . 'b:) L1- 3. ao <br />(east side) <br /> Per Week = <br /> $ <br />H SUBTOTAL ~~~Z.6'G <br /> / <br />I. PARKING LOTS <br /> X $ $ <br />11 Under the 52 Weeks 2(o.~ /6 ~U.6"{) <br /> William Lehman Causeway Bridge I <br /> Per Week = <br /> X $ $ g, I q(), a1l <br />12 Under the north bound 52 Weeks tt5 7", ~() <br />William Lehman Flyover Ramp <br /> Per Week = <br /> X $ tf -q- ,'~ $ <br />13 Ellen Wynne Beach Access 52 Weeks 2/Y51.(Jt) <br /> Per Week = <br /> <br />PAGE 39 OF 92 <br />BID No. 07-10-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.