My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(07-10-04) Landscaping Maintenance Services
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:50 PM
Creation date
8/13/2008 3:01:18 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Maintenance Services
Bid No. (xx-xx-xx)
07-10-04
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,- <br />I <br />I <br /> <br />equipment shall accrue to Cityl and Contractor shall make provisions so that they may be <br />obtained. <br /> <br />4.27.7.3.Payments made by Contractor to the Sub-Contractors for Work performed by Sub- <br />Contractors. If required by City, Contractor shall obtain competitive bids from Sub-Contractors <br />acceptable to him and shall deliver such bids to City who will then determine which Bids will be <br />accepted. If a Subcontract provides that the Sub-Contractor is to be paid on the basis of Cost of <br />Work plus a feel the cost of the Work shall be determined in accordance with this section. <br /> <br />4.27.7.4. Rentals of all construction equipment and machinery and the parts thereof whether <br />rented from Contractor or others in accordance with rental agreements approved by City, and the <br />costs of transportation, loading, unloading, installation, dismantling and removal thereof - all in <br />accordance with terms of said rental agreements. The rental of any such equipment, machinery <br />or parts shall cease when the use thereof is no longer necessary for the Work. <br /> <br />4.27.7.5. Sales, use or similar taxes related to the Work, and for which Contractor is liable, <br />imposed by any governmental authority. <br /> <br />4.27.7.6. Payments and fees for permits and licenses. Costs for permits and licenses must be <br />shown as a separate item. <br /> <br />4.27.7.7.The cost of utilities, fuel and sanitary facilities at the site. <br /> <br />4.27.7.8. Minor expenses such as telegrams, long distance telephone calls, telephone service at <br />the site, expressage and similar petty cash items in connection with the Work. <br /> <br />4.27.7.9.Cost of premiums for additional Bonds and Insurance required solely because of <br />changes in the Work, not to exceed two percent (2%) of the increase in the Cost of the Work. <br /> <br />4.27.8. The term Cost of the Work shall not include any of the following: <br /> <br />4.27.8.1. Payroll costs and other compensation of Contractor's officers, executives, principals (of <br />partnership and sole proprietorships), general managers, engineers, architects, estimators, <br />lawyers, agents, expediters, timekeepers, clerks and other personnel employed by Contractor <br />whether at the site or in his principal or a branch office for general administration of the Work <br />and not specifically included in the schedule referred to in this document - all of which are to be <br />considered administrative costs covered by the Contractor's fee. <br /> <br />4.27.8.2. Expenses of Contractor's principal and branch offices other than his office at the site. <br /> <br />4.27.8.3.Any part of Contractor's capital expenses, including interest on Contractor's capital <br />employed for the Work and charges against Contractor for delinquent payments. <br /> <br />4.27.8.4. Cost of premiums for all bonds and for all insurance policies whether or not Contractor <br />is required by the Contract Documents to purchase and maintain the same (except as otherwise <br />provided this document. <br /> <br />4.27.8.5. Costs due to the negligence of Contractor, any Sub-Contractor, or anyone directly or <br />indirectly employed by any of them of for whose acts any of them may be liable, including but <br />not limited to, the correction of defective work, disposal of materials or equipment wrongly <br />supplied and making good any damage to property. <br /> <br />4.27.8.6.Other overhead or general expense costs of any kind and the costs of any item not <br /> <br />PAGE 20 OF 92 <br />BID No. 07-10-04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.