Laserfiche WebLink
<br /> x $ $ <br />B8 One Irrigation Laborer SO Hours <br />(All other times) <br /> Per Hour = <br /> $ <br />B SUBTOTAL <br />c. EQUIPMENT <br /> X $ $ <br />Cl One Front End Loader with Backhoe, 250 Hours <br />including an Operator <br /> Per Hour = <br /> X $ $ <br />C2 One Front End Loader with Backhoe, 30 Days <br />including an Operator <br /> Per Day = <br /> X $ $ <br />C3 One Front End Loader with Backhoe, 4 Weeks <br /> including an Operator Per Week = <br /> X $ $ <br />C4 One Front End Loader with Backhoe, 1 Month <br />including an Operator <br /> Per Month = <br /> X $ $ <br />C5 One 15,000 GVW (or larger) Dump 100 Hours <br />Truck with an Operator <br /> Per Hour = <br /> X $ $ <br />C6 One 15,000 GVW (or larger) Dump 10 Days <br />Truck with an Operator <br /> Per Day = <br /> X $ $ <br />C7 One 15,000 GVW (or larger) Dump 1 Week <br />Truck with an Operator <br /> Per Week = <br /> X $ $ <br />C8 One 15,000 GVW (or larger) Dump 1 Month <br />Truck with an Operator <br /> Per Month = <br /> X $ $ <br /> One Trailer Mounted Water Tank (500 <br />C9 gallon minimum) with Pump and Hose 20 Days <br /> Reel Per Day = <br /> X $ $ <br /> One Trailer Mounted Water Tank (500 <br />Cl0 gallon minimum) with Pump and Hose 2 Weeks <br /> Reel Per Week = <br /> X $ $ <br /> One Trailer Mounted Water Tank (500 <br />Cll gallon minimum) with Pump and Hose 1 Month <br /> Reel Per Month = <br /> <br />PAGE 31 OF 92 <br />BID No. 07-10-04 <br />