Laserfiche WebLink
<br />This is a separate item for work not already covered by, and paid for through, other pertinent bid <br />items. It is intended that this item shall cover call-outs for emergency and unique situations. <br />For this item to be accepted and paid for by the City, the services must be specifically requested <br />by the City for a specific task. <br /> <br />C9. thru Cl1. This bid item is to provide a fully functioning and properly maintained Trailer Mounted <br />Water Tank with a capacity of 500 gallons or greater. It should also have an operating and <br />properly maintained pump and hose reel. This is a separate item for work not already covered <br />by, and paid for through, other pertinent bid items. It is intended that this item shall cover call- <br />outs for emergency and unique situations. For this item to be accepted and paid for by the City, <br />the services must be specifically requested by the City for a specific task. <br /> <br />C12. thru C15. This bid item is to provide a fully functioning and properly maintained Self Propelled <br />Trencher with a minimum attainable depth of twenty-four inches, and a minimum trench width of <br />six inches. This is a separate item for work not already covered by, and paid for through, other <br />pertinent bid items. It is intended that this item shall cover call-outs for emergency and unique <br />situations. For this item to be accepted and paid for by the City, the services must be specifically <br />requested by the City for a specific task. <br /> <br />C16. This bid item is to provide a fully functioning and properly maintained bucket truck. This is a <br />separate item for work not already covered by, and paid for through, other pertinent bid items. <br />It is intended that this item shall cover call-outs for emergency and unique situations. For this <br />item to be accepted and paid for by the City, the services must be specifically requested by the <br />City for a specific task. <br /> <br />C17. This bid item is to provide a fully functioning and properly maintained chipper brush. This is a <br />separate item for work not already covered by, and paid for through, other pertinent bid items. <br />It is intended that this item shall cover call-outs for emergency and unique situations. For this <br />item to be accepted and paid for by the City, the services must be specifically requested by the <br />City for a specific task. <br /> <br />C18. This bid item is to provide a fully functioning and properly maintained stump grinder. This is a <br />separate item for work not already covered by, and paid for through, other pertinent bid items. <br />It is intended that this item shall cover call-outs for emergency and unique situations. For this <br />item to be accepted and paid for by the City, the services must be specifically requested by the <br />City for a specific task. <br /> <br />C19. This bid item is to provide a fully functioning and properly maintained grapple loader with a 30 <br />cubic yard capacity. This is a separate item for work not already covered by, and paid for <br />through, other pertinent bid items. It is intended that this item shall cover call-outs for <br />emergency and unique situations. For this item to be accepted and paid for by the City, the <br />services must be specifically requested by the City for a specific task. <br /> <br />D. MATERIALS <br /> <br />D1. This bid item is to include the supplying, delivery, placement, and grading of topsoil in the <br />locations designated by the City. This topsoil shall be a mix of 70% organics (peat moss, etc.) <br />and 30% sand. The supplying and placing of this item is separate and unique from the normal <br />need to supply and place this material as part of the ongoing operations covered in other bid <br />items. For this item to be accepted and paid for by the City, the service must be specifically <br />requested by the City for a unique and specific task. In areas of traffic, the bid will include all <br />appropriate traffic control devices that conform to an approved Management of Traffic (MOT) <br />plan. All traffic control costs shall be a part of the unit price bid and shall not be paid for <br /> <br />PAGE 44 OF 92 <br />BID No. 07-10-04 <br />