My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Solution Construction, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Responses
>
Solution Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:50 PM
Creation date
8/15/2008 3:36:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DOCUMENT 00403 <br /> <br />TRENCH SAFETY ACT <br /> <br />(90-96, Laws of Florida) <br /> <br />Bidder acknowledges that included in the appropriate bid items of the proposal and in the <br />Total Bid Price are costs for complying with the Florida Trench Safety Act {90-96, Laws of <br />Florida} effective October 1, 1990. The bidder further identifies the costs of such <br />compliance to be summarized below: <br /> <br />Trench Safety <br />Measure <br />(Description) <br /> <br />Unit of <br />Measure <br />(LFSF) <br /> <br />iF <br /> <br />Unit <br />(Quantity) <br /> <br />Unit <br />Cost <br /> <br />Extended <br />Cost <br /> <br />Lj 5.0(/ <br /> <br />LI/t;, th;J tE~ <br /> <br />Lr. <br /> <br />Total $ LJ5,oo nt:' i.I. <br /> <br />If applicable, the Contractor certifies that all trench excavation done within his control in <br />excess of five feet in depth shall be in accordance with the Florida Department of <br />Transportation's Special Provisions Article 125-1 and. Subarticle 125-4.1 (TRENCH <br />EXCAVATION SAFETY SYSTEM AND SHORING, SPECIAL - TRENCH EXCAVATION). <br /> <br />Failure to complete the above may result in the bid being declared non-responsive. <br /> <br />Contractor agrees that the above safety compliances and costs are included in his bid <br />package. <br /> <br /> <br />END OF DOCUMENT <br /> <br />04/08 <br /> <br />00403-1 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.