Laserfiche WebLink
<br />I <br />I <br />I WORK IN PROGRESS <br /> & <br /> COMPLETED JOBS <br />I Name of Owner/ Name of Type of Work Contract <br /> Contractor Project Performed Amount <br />I · Fraga Properties Temporary Road Base & Asphalt $21,515.00 <br /> Road <br />I · Cuesta Construction Mother of Site Grading, Base, $85,000.00 <br /> Christ School & Asphalt Courts <br />I · Cuesta Construction Bank United Site Grading, & $120,000.00 <br /> Parking Lot <br />I · Cuesta Construction Vilazul Condos Site Clearing, & $6,735.00 <br /> Trash Hauling <br />I . Advanced Construction Valet Entrance Roadway Cut, Base $30,000.00 <br /> @ Bayside Prep" & Asphalt <br />I · Lemartec Engineering SAS Building Building Pad, Site $190,000.00 <br /> & Construction Materials Drainage, Water <br />I System, & Parking <br /> Lot <br />I · ABC Construction Ives State Park Baseball Field, $865,000.00 <br /> Soccer Field, Water, <br />I Sewer, Drainage, & <br /> Parking Lot <br /> · ABC Construction Shops @ Serena Water, Sewer, $257,040.00 <br />I Lakes Drainage, & Parking <br /> Lot <br />I · Ves Enterprise Juana Subdivision Limerock Base, & $18,000.00 <br /> Asphalt Roadway <br />I · Alliance Construction Vue Beach Club Drainage System, $113,700.00 <br /> Paver Walkway, & <br />I Water System <br />· F .H. Paschen, SN Black Police Drainage, Water, $117,255.00 <br /> Nielsen Precinct & Museum Drainage, & Earthwork <br />I Iii <br /> J~,I:f.'~J' <br /> SOLUTION <br />I Con!itruction, InC'.. <br /> !.II: Il:C.t.: '~i~"""" <br />