Laserfiche WebLink
<br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />19. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />18.4 The Owner reserves the right to hold all proposals and bid guarantees for a <br />period not to exceed 90 days after the date of bid opening stated in the <br />Advertisement for Bids. <br /> <br />18.5 The award of the contract, if it is awarded, will be to the lowest responsible <br />and responsive bidder whose bid best serves the interests of, and represents <br />the best value to, the Owner pursuant to the criteria set forth in Section 62- <br />8 of the City Code of Sunny Isles Beach, and whose proposal shall comply <br />with the requirements of the Contract Documents. Time is of the essence for <br />this project and the time limits set in the proposal, if set by the bidder, will <br />be accorded weight by the Owner in the determination of the best proposal. <br />In no case will the award be made until all necessary investigations have <br />been made into the responsibility of the bidder and the Owner is satisfied <br />that the bidder is qualified to do the Work and have the necessary <br />organization, capital and equipment to carry out the provisions of the <br />contract to the satisfaction of the Owner within the time specified. <br /> <br />18.6 If the Contractor feels that a problem exists either prior to, or during the bid <br />opening, he/she shall contact the City (within 24 hours of the bid opening) <br />and follow the City's current policy for bid protests. <br /> <br />18.7 The Owner reserves the right to award as a total contract any combination <br />of the Unit Price Bid Schedule Items that would be in the best interest of the <br />Owner. <br /> <br />CASH ALLOWANCES <br /> <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document <br />00300, for this purpose only. The Contractor shall not proceed on any <br />additional work to be covered by allowances until authorized in writing by <br />the Engineer. Such work shall be approved by the Owner, shall be within the <br />scope of work defined by this Contract and shall not exceed the amount <br />indicated in the Bid Form. Any amount remaining in the Cash Allowance will <br />be retained by the Owner. <br /> <br />END OF DOCUMENT <br /> <br />04/08 <br /> <br />001 00-8 <br /> <br />06-5723 <br />