My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />will release or discharge the assignor from any duty or responsibility under the Contract <br />Documents. <br /> <br />9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and <br />legal representatives to the other party hereto, its partners, successors, assigns and legal <br />representatives in respect to all covenants, agreements and obligations contained in the <br />Contract Documents. <br /> <br />9.4. Any provisions or part of the Contract Documents held to be void or unenforceable under <br />any Law or Regulation shall be deemed stricken, and all remaining provisions shall <br />continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the <br />Contract Documents shall be reformed to replace such stricken provisions or part thereof <br />with a valid and enforceable provision that comes as close as possible to expressing the <br />intention of the stricken provision. <br /> <br />9.5. OTHER PROVISIONS. <br /> <br />9.5.1. DRAWINGS <br /> <br />DESCRIPTION <br /> <br />SHEET NO. <br /> <br />E101 Power Plan <br />E102 Electrical Riser and Panel Schedules <br /> <br />I <br />I <br /> <br />9.5.2. In accordance with the indemnification provision contained in the General Conditions, the <br />CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY ISLES BEACH, and <br />their agents and employees, from or on account of any injuries or damages received or sustained <br />by any person or person during or on account of any operations connected with the construction of <br />all Work; or by or in consequence of any negligence in connection with the same; or by use of any <br />improper materials or by or on account of any act or omission of the said Contractor, subcontractor, <br />agents, servants, or employees; and <br /> <br />I <br />I <br />I <br />I <br /> <br />9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the <br />construction, public liability insurance, by separate certificate, in an amount not less than $1,000,000 <br />for injuries, including willful death, to anyone person and subject to those same limits for each <br />person, in an amount not less that $1,000,000 for damages as a result of each occurrence and <br />property damage insurance and in an amount not less than $1,000,000 for damages on anyone <br />occurrence. Such policy shall specifically protect the CITY OF SUNNY ISLES BEACH, AND their <br />agents and employees, by making them an additional insured, and shall not be modified or <br />canceled without thirty (30) days written notice to the CITY OF SUNNY ISLES BEACH. <br /> <br />I <br /> <br />9.5.4 Should the final completion and acceptance of the work herein embraced together with <br />any modification or additions be delayed beyond the time herein set because of lace of performance <br />by the Contract, it is understood and agreed that aside from any other liquidated damage per day for <br />such delay from such time until the work is completed and accepted as herein provided, all costs of <br />engineering and inspection on behalf of the Owner will be charged to the contractor and deducted <br />from any estimate or payment otherwise due and payable to him from time to time. The costs of <br />engineering and inspection which may be charged to the Contractor by the Owner under this article <br />shall be equal to the Engineer's charges to the Owner. <br /> <br />I <br /> <br />I <br />I <br /> <br />04/08 Final Version <br /> <br />00500-5 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.