My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />condition causes an increase or decrease in Contractor's <br />cost of, or time required for, performance of the Work; <br />subject, however, to the following: <br /> <br />I <br /> <br />I <br /> <br />a. such condition must meet anyone or more of <br />the categories described in Paragraph 4.03.A; <br />and <br /> <br />I <br /> <br />b. with respect to Work that is paid for on a Unit <br />Price Basis, any adjustment in Contract Price <br />will be subject to the provisions of Paragraphs <br />9.07 and 11.03. <br /> <br />I <br /> <br />2. Contractor shall not be entitled to any <br />adjustment in the Contract Price or Contract Times if: <br /> <br />I <br /> <br />a. Contractor knew of the existence of such <br />conditions at the time Contractor made a final <br />commitment to Owner with respect to Contract <br />Price and Contract Times by the submission of a <br />Bid or becoming bound under a negotiated <br />contract; or <br /> <br />I <br /> <br />I <br /> <br />b. the existence of such condition could <br />reasonably have been discovered or revealed as a <br />result of any examination, investigation, explo- <br />ration, test, or study of the Site and contiguous <br />areas required by the Bidding Requirements or <br />Contract Documents to be conducted by or for <br />Contractor prior to Contractor's making such <br />final commitment; or <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />c. Contractor failed to give the written notice as <br />required by Paragraph 4.03.A. <br /> <br />I <br /> <br />3. If Owner and Contractor are unable to agree <br />on entitlement to or on the amount or extent, if any, of <br />any adjustment in the Contract Price or Contract Times, <br />or both, a Claim may be made therefor as provided in <br />Paragraph 10.05. However, Owner and Engineer, and any <br />of their Related Entities shall not be liable to Contractor <br />for any claims, costs, losses, or damages (including but <br />not limited to all fees and charges of engineers, architects, <br />attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) sustained by <br />Contractor on or in connection with any other project or <br />anticipated project. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />4.04 Underground Facilities <br /> <br />I <br /> <br />A. Shown or Indicated: The information and data <br />shown or indicated in the Contract Documents with <br />respect to existing Underground Facilities at or <br />contiguous to the Site is based on information and data <br />furnished to Owner or Engineer by the owners of such <br />Underground Facilities, including Owner, or by others. <br />Unless it is otherwise expressly provided in the Sup- <br />plementary Conditions: <br /> <br />I <br /> <br />I <br /> <br />I. Owner and Engineer shall not be responsible <br />for the accuracy or completeness of any such information <br />or data; and <br /> <br />2. the cost of all of the following will be <br />included in the Contract Price, and Contractor shall have <br />full responsibility for: <br /> <br />a. reviewing and checking al! such information <br />and data, <br /> <br />b. locating all Underground Facilities shown or <br />indicated in the Contract Documents, <br /> <br />c. coordination of the Work with the owners of <br />such Underground Facilities, including Owner, <br />during construction, and <br /> <br />d. the safety and protection of all such Under- <br />ground Facilities and repairing any damage <br />thereto resulting from the Work. <br /> <br />B. Not Shown or Indicated <br /> <br />I. If an Underground Facility is uncovered or <br />revealed at or contiguous to the Site which was not shown <br />or indicated, or not shown or indicated with reasonable <br />accuracy in the Contract Documents, Contractor shaH, <br />promptly after becoming aware thereof and before further <br />disturbing conditions affected thereby or performing any <br />Work in connection therewith (except in an emergency as <br />required by Paragraph 6. 16.A), identify the owner of such <br />Underground Facility and give written notice to that <br />owner and to Owner and Engineer. Engineer will <br />promptly review the Underground Facility and determine <br />the extent, if any, to which a change is required in the <br />Contract Documents to reflect and document the <br />consequences of the existence or location of the Under- <br />ground Facility. During such time, Contractor shal1 be <br />responsible for the safety and protection of such <br />Underground Facility. <br /> <br />2. If Engineer concludes that a change in the <br />Contract Documents is required, a Work Change <br />Directive or a Change Order wil1 be issued to reflect and <br />document such consequences. An equitable adjustment <br />shall be made in the Contract Price or Contract Times, or <br />both, to the extent that they are attributable to the <br />existence or location of any Underground Facility that <br />was not shown or indicated or not shown or indicated <br />with reasonable accuracy in the Contract Documents and <br />that Contractor did not know of and could not reasonably <br />have been expected to be aware of or to have anticipated. <br />If Owner and Contractor are unable to agree on <br />entitlement to or on the amount or extent, if any, of any <br />such adjustment in Contract Price or Contract Times, <br />Owner or Contractor may make a Claim therefor as <br />provided in Paragraph 10.05. <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright <!d 2002 National Society of Professional Engineers for EJCnc. All rights reserved. <br />00700 - 13 <br /> <br />I <br /> <br />04/08 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.