Laserfiche WebLink
<br />I <br /> <br />circumstances. The superintendent will be Contractor's <br />representative at the Site and shall have authority to act on <br />behalf of Contractor. All communications given to or <br />received from the superintendent shall be binding on <br />Contractor. <br /> <br />I <br /> <br />I <br /> <br />6.02 Labor; Working Hours <br /> <br />I <br /> <br />A. Contractor shall provide competent, suitably <br />qualified personnel to survey and layout the Work and <br />perform construction as required by the Contract Docu- <br />ments. Contractor shall at all times maintain good disci- <br />pline and order at the Site. <br /> <br />I <br /> <br />B. Except as otherwise required for the safety or <br />protection of persons or the Work or property at the Site <br />or adjacent thereto, and except as otherwise stated in the <br />Contract Documents, all Work at the Site shall be <br />performed during regular working hours. Contractor will <br />not permit the performance of Work on a Saturday, <br />Sunday, or any legal holiday without Owner's written <br />consent (which will not be unreasonably withheld) given <br />after prior written notice to Engineer. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />6.03 Services, Materials, and Equipment <br /> <br />I <br /> <br />A. Unless otherwise specified in the Contract <br />Documents, Contractor shall provide and assume full <br />responsibility for all services, materials, equipment, labor, <br />transportation, construction equipment and machinery, <br />tools, appliances, fuel, power, light, heat, telephone, <br />water, sanitary facilities, temporary facilities, and all other <br />facilities and incidentals necessary for the performance, <br />testing, start-up, and completion ofthe Work. <br /> <br />I <br /> <br />I <br /> <br />B. All materials and equipment incorporated into <br />the Work shall be as specified or, ifnot specified, shall be <br />of good quality and new, except as otherwise provided in <br />the Contract Documents. All special warranties and <br />guarantees required by the Specifications shall expressly <br />run to the benefit of Owner. If required by Engineer, <br />Contractor shall furnish satisfactory evidence (including <br />reports of required tests) as to the source, kind, and <br />quality of materials and equipment. <br /> <br />E <br /> <br />I <br /> <br />I <br /> <br />C. All materials and equipment shall be stored, <br />applied, installed, connected, erected, protected, used, <br />cleaned, and conditioned in accordance with instructions <br />of the applicable Supplier, except as otherwise may be <br />provided in the Contract Documents. <br /> <br />I <br /> <br />I <br /> <br />6.04 Progress Schedule <br /> <br />I <br /> <br />A. Contractor shall adhere to the Progress <br />Schedule established in accordance with Paragraph 2.07 <br />as it may be adjusted from time to time as provided <br />below. <br /> <br />I <br /> <br />I. Contractor shall submit to Engineer for <br />acceptance (to the extent indicated in Paragraph 2.07) <br />proposed adjustments in the Progress Schedule that will <br />not result in changing the Contract Times. Such adjust- <br />ments will comply with any provisions of the General Re- <br />quirements applicable thereto. <br /> <br />2. Proposed adjustments in the Progress <br />Schedule that will change the Contract Times shall be <br />submitted in accordance with the requirements of Article <br />12. Adjustments in Contract Times may only be made by <br />a Change Order. <br /> <br />6.05 Substitutes and "Or-Equals" <br /> <br />A. Whenever an item of material or equipment is <br />specified or described in the Contract Documents by <br />using the name of a proprietary item or the name of a <br />particular Supplier, the specification or description is <br />intended to establish the type, function, appearance, and <br />quality required. Unless the specification or description <br />contains or is followed by words reading that no like, <br />equivalent, or "or-equal" item or no substitution is <br />permitted, other items of material or equipment or <br />material or equipment of other Suppliers may be <br />submitted to Engineer for review under the circumstances <br />described below. <br /> <br />I. "Or-Equal" Items: If in Engineer's sole <br />discretion an item of material or equipment proposed by <br />Contractor is functionally equal to that named and <br />sufficiently similar so that no change in related Work will <br />be required, it may be considered by Engineer as an <br />"or-equal" item, in which case review and approval of the <br />proposed item may, in Engineer's sole discretion, be <br />accomplished without compliance with some or all of the <br />requirements for approval of proposed substitute items. <br />For the purposes of this Paragraph 6.05.A.l, a proposed <br />item of material or equipment will be considered <br />functionally equal to an item so named if: <br /> <br />a, in the exercise of reasonable judgment <br />Engineer determines that: <br /> <br />1) it is at least equal in materials of <br />construction, quality, durability, appearance, <br />strength, and design characteristics; <br /> <br />2) it will reliably perform at least <br />equally well the function and achieve the results <br />imposed by the design concept of the completed <br />Project as a functioning whole, <br /> <br />3) it has a proven record of performance <br />and availability of responsive service; and <br /> <br />b. Contractor certifies that, if approved and <br />incorporated into the Work: <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright (j'J 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 19 <br /> <br />I <br /> <br />04/08 <br /> <br />06-5723 <br />