<br />I
<br />
<br />keep the Site and other areas free from accumulations of
<br />waste materials, rubbish, and other debris. Removal and
<br />disposal of such waste materials, rubbish, and other debris
<br />shall conform to applicable Laws and Regulations.
<br />
<br />I
<br />
<br />I
<br />
<br />C. Cleaning: Prior to Substantial Completion of
<br />the Work Contractor shall clean the Site and the Work
<br />and make it ready for utilization by Owner. At the com-
<br />pletion of the Work Contractor shall remove from the Site
<br />all tools, appliances, construction equipment and
<br />machinery, and surplus materials and shall restore to
<br />original condition all property not designated for
<br />alteration by the Contract Documents.
<br />
<br />I
<br />
<br />I
<br />
<br />D. Loading Structures: Contractor shall not load
<br />nor permit any part of any structure to be loaded in any
<br />manner that will endanger the structure, nor shall
<br />Contractor subject any part of the Work or adjacent
<br />property to stresses or pressures that will endanger it.
<br />
<br />I
<br />
<br />I
<br />
<br />6.12 Record Documents
<br />
<br />I
<br />
<br />A. Contractor shall maintain in a safe place at the
<br />Site one record copy of all Drawings, Specifications,
<br />Addenda, Change Orders, Work Change Directives, Field
<br />Orders, and written interpretations and clarifications in
<br />good order and annotated to show changes made during
<br />construction. These record documents together with all
<br />approved Samples and a counterpart of all approved Shop
<br />Drawings will be available to Engineer for reference.
<br />Upon completion of the Work, these record documents,
<br />Samples, and Shop Drawings will be delivered to Engi-
<br />neer for Owner.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />6.13 Safety and Protection
<br />
<br />I
<br />
<br />A. Contractor shall be solely responsible for
<br />initiating, maintaining and supervising all safety precau-
<br />tions and programs in connection with the Work.
<br />Contractor shall take all necessary precautions for the
<br />safety of, and shall provide the necessary protection to
<br />prevent damage, injury or loss to:
<br />
<br />I
<br />
<br />I
<br />
<br />1. all persons on the Site or who may be affected
<br />by the Work;
<br />
<br />I
<br />
<br />2. all the Work and materials and equipment to
<br />be incorporated therein, whether in storage on or off the
<br />Site; and
<br />
<br />I
<br />
<br />3. other property at the Site or adjacent thereto,
<br />including trees, shrubs, lawns, walks, pavements,
<br />roadways, structures, utilities, and Underground Facilities
<br />not designated for removal, relocation, or replacement in
<br />the course of construction.
<br />
<br />I
<br />
<br />B, Contractor shall comply with all applicable
<br />Laws and Regulations relating to the safety of persons or
<br />property, or to the protection of persons or property from
<br />
<br />I
<br />
<br />damage, injury, or loss; and shall erect and maintain all
<br />necessary safeguards for such safety and protection.
<br />Contractor shall notify owners of adjacent property and of
<br />Underground Facilities and other utility owners when
<br />prosecution of the Work may affect them, and shall
<br />cooperate with them in the protection, removal,
<br />relocation, and replacement of their property.
<br />
<br />C. All damage, injury, or loss to any property
<br />referred to in Paragraph 6.13.A.2 or 6.13.A.3 caused,
<br />directly or indirectly, in whole or in part, by Contractor,
<br />any Subcontractor, Supplier, or any other individual or
<br />entity directly or indirectly employed by any of them to
<br />perform any of the Work, or anyone for whose acts any of
<br />them may be liable, shall be remedied by Contractor
<br />(except damage or loss attributable to the fault of Draw-
<br />ings or Specifications or to the acts or omissions of
<br />Owner or Engineer or , or anyone employed by any of
<br />them, or anyone for whose acts any of them may be
<br />liable, and not attributable, directly or indirectly, in whole
<br />or in part, to the fault or negligence of Contractor or any
<br />Subcontractor, Supplier, or other individual or entity
<br />directly or indirectly employed by any of them).
<br />
<br />D. Contractor's duties and responsibilities for
<br />safety and for protection of the Work shall continue until
<br />such time as all the Work is completed and Engineer has
<br />issued a notice to Owner and Contractor in accordance
<br />with Paragraph 14.07.B that the Work is acceptable
<br />(except as otherwise expressly provided in connection
<br />with Substantial Completion).
<br />
<br />6.14 Safety Representative
<br />
<br />A. Contractor shall designate a qualified and
<br />experienced safety representative at the Site whose duties
<br />and responsibilities shall be the prevention of accidents
<br />and the maintaining and supervising of safety precautions
<br />and programs.
<br />
<br />6.15 Hazard Communication Programs
<br />
<br />A. Contractor shall be responsible for coordi-
<br />nating any exchange of material safety data sheets or
<br />other hazard communication information required to be
<br />made available to or exchanged between or among
<br />employers at the Site in accordance with Laws or
<br />Regulations.
<br />
<br />6.16 Emergencies
<br />
<br />A. In emergencies affecting the safety or protec-
<br />tion of persons or the Work or property at the Site or
<br />adjacent thereto, Contractor is obligated to act to prevent
<br />threatened damage, injury, or loss. Contractor shall give
<br />Engineer prompt written notice if Contractor believes that
<br />any significant changes in the Work or variations from the
<br />Contract Documents have been caused thereby or are
<br />required as a result thereof. If Engineer determines that a
<br />
<br />EJCDC C-700 Standard General Conditions of the Construction Contract.
<br />Copyright @ 2002 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />00700 - 23