My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />the following will be set forth in Supplementary Condi- <br />tions: <br /> <br />I <br /> <br />1. the individual or entity who will have <br />authority and responsibility for coordination of the <br />activities among the various contractors will be identified; <br /> <br />I <br /> <br />2. the specific matters to be covered by such <br />authority and responsibility will be itemized; and <br /> <br />I <br /> <br />3. the extent of such authority and responsibili- <br />ties will be provided. <br /> <br />I~ <br /> <br />B. Unless otherwise provided in the <br />Supplementary Conditions, Owner shall have sole <br />authority and responsibility for such coordination. <br /> <br />I <br /> <br />7.03 Legal Relationships <br /> <br />I <br /> <br />A. Paragraphs 7.0l.A and 7.02 are not applicable <br />for utilities not under the control of Owner. <br /> <br />I <br /> <br />B. Each other direct contract of Owner under <br />Paragraph 7.0 l.A shall provide that the other contractor is <br />liable to Owner and Contractor for the reasonable direct <br />delay and disruption costs incurred by Contractor as a <br />result of the other contractor's actions or inactions. <br /> <br />I <br /> <br />C. Contractor shall be liable to Owner and any <br />other contractor for the reasonable direct delay and <br />disruption costs incurred by such other contractor as a <br />result of Contractor's action or inactions. <br /> <br />I <br /> <br />I <br /> <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br /> <br />I <br /> <br />8.0 I Communications to Contractor <br /> <br />I <br /> <br />A. Except as otherwise provided in these General <br />Conditions, Owner shall issue all communications to <br />Contractor through Engineer. <br /> <br />8.02 Replacement of Engineer <br /> <br />I <br /> <br />A. In case of termination of the employment of <br />Engineer, Owner shall appoint an engineer to whom <br />Contractor makes no reasonable objection, whose status <br />under the Contract Documents shall be that of the former <br />Engineer. <br /> <br />I <br /> <br />I <br /> <br />8.03 Furnish Data <br /> <br />I <br /> <br />A. Owner shall promptly furnish the data <br />required of Owner under the Contract Documents. <br /> <br />I <br /> <br />8.04 <br /> <br />Pay When Due <br /> <br />A. Owner shall make payments to Contractor <br />when they are due as provided in Paragraphs 14.02.C and <br />14.07.C. <br /> <br />8.05 Lands and Easements; Reports and Tests <br /> <br />A. Owner's duties in respect of providing lands <br />and easements and providing engineering surveys to <br />establish reference points are set forth in Paragraphs 4.01 <br />and 4.05. Paragraph 4.02 refers to Owner's identifying <br />and making available to Contractor copies of reports of <br />explorations and tests of subsurface conditions and <br />drawings of physical conditions in or relating to existing <br />surface or subsurface structures at or contiguous to the <br />Site that have been utilized by Engineer in preparing the <br />Contract Documents. <br /> <br />8.06 Insurance <br /> <br />A. Owner's responsibilities, if any, in respect to <br />purchasing and maintaining liability and property insur- <br />ance are set forth in Article 5. <br /> <br />8.07 Change Orders <br /> <br />A. Owner is obligated to execute Change Orders <br />as indicated in Paragraph 10.03. <br /> <br />8.08 Inspections, Tests, and Approvals <br /> <br />A. Owner's responsibility in respect to certain <br />inspections, tests, and approvals is set forth in Paragraph <br />13.03.B. <br /> <br />8.09 Limitations on Owner's Responsibilities <br /> <br />A. The Owner shall not supervise, direct, or have <br />control or authority over, nor be responsible for, <br />Contractor's means, methods, techniques, sequences, or <br />procedures of construction, or the safety precautions and <br />programs incident thereto, or for any failure of Contractor <br />to comply with Laws and Regulations applicable to the <br />performance of the Work. Owner will not be responsible <br />for Contractor's failure to perform the Work in <br />accordance with the Contract Documents. <br /> <br />8.10 Undisclosed <br />Condition <br /> <br />Hazardous <br /> <br />Environmental <br /> <br />A. Owner's responsibility in respect to an undis- <br />closed Hazardous Environmental Condition is set forth in <br />Paragraph 4.06. <br /> <br />8.11 Evidence of Financial Arrangements <br /> <br />A. If and to the extent Owner has agreed to <br />furnish Contractor reasonable evidence that financial <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright if) 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 27 <br /> <br />I <br /> <br />04/08 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.