My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />by such Subcontractor under Paragraphs <br />11.01.A.l and 11.0 I.A.2 and that any higher tier <br />Subcontractor and Contractor will each be paid a <br />fee of five percent of the amount paid to the next <br />lower tier Subcontractor; <br /> <br />I <br /> <br />I <br /> <br />d. no fee shall be payable on the basis of costs <br />itemized under Paragraphs 11.0 1.AA, 11.0 1.A.S, <br />and 11.01.B; <br /> <br />I <br /> <br />e. the amount of credit to be allowed by <br />Contractor to Owner for any change which <br />results in a net decrease in cost will be the <br />amount of the actual net decrease in cost plus a <br />deduction in Contractor's fee by an amount equal <br />to five percent of such net decrease; and <br /> <br />I <br /> <br />I <br /> <br />f. when both additions and credits are involved <br />in anyone change, the adjustment in <br />Contractor's fee shall be computed on the basis <br />of the net change in accordance with Paragraphs <br />12.0I.C.2.a through 12.01.C.2.e, inclusive. <br /> <br />I <br /> <br />I <br /> <br />12.02 Change of Contract Times <br /> <br />I <br /> <br />A. The Contract Times may only be changed by <br />a Change Order. Any Claim for an adjustment in the <br />Contract Times shall be based on written notice submitted <br />by the party making the Claim to the Engineer and the <br />other party to the Contract in accordance with the <br />provisions of Paragraph 10.0 S. <br /> <br />I <br /> <br />B. Any adjustment of the Contract Times <br />covered by a Change Order or any Claim for an <br />adjustment in the Contract Times will be determined in <br />accordance with the provisions ofthis Article 12. <br /> <br />I <br /> <br />I <br /> <br />12.03 Delays <br /> <br />I <br /> <br />A. Where Contractor is prevented from <br />completing any part of the Work within the Contract <br />Times due to delay beyond the control of Contractor, the <br />Contract Times will be extended in an amount equal to <br />the time lost due to such delay if a Claim is made therefor <br />as provided in Paragraph 12.02.A. Delays beyond the <br />control of Contractor shall include, but not be limited to, <br />acts or neglect by Owner, acts or neglect of utility owners <br />or other contractors performing other work as contemplat- <br />ed by Article 7, fires, floods, epidemics, abnormal <br />weather conditions, or acts of God. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />B. If Owner, Engineer, or other contractors or <br />utility owners performing other work for Owner as <br />contemplated by Article 7, or anyone for whom Owner is <br />responsible, delays, disrupts, or interferes with the <br />performance or progress of the Work, then Contractor <br />shall be entitled to an equitable adjustment in the Contract <br />Price or the Contract Times , or both. Contractor's <br />entitlement to an adjustment of the Contract Times is <br /> <br />I <br /> <br />I <br /> <br />conditioned on such adjustment being essential to <br />Contractor's ability to complete the Work within the <br />Contract Times. <br /> <br />C If Contractor is delayed in the performance or <br />progress of the Work by fire, flood, epidemic, abnonnal <br />weather conditions, acts of God, acts or failures to act of <br />utility owners not under the control of Owner, or other <br />causes not the fault of and beyond control of Owner and <br />Contractor, then Contractor shall be entitled to an <br />equitable adjustment in Contract Times, if such <br />adjustment is essential to Contractor's ability to complete <br />the Work within the Contract Times. Such an adjustment <br />shall be Contractor's sole and exclusive remedy for the <br />delays described in this Paragraph 12.03.C. <br /> <br />D. Owner, Engineer and the Related Entities of <br />each of them shall not be liable to Contractor for any <br />claims, costs, losses, or damages (including but not <br />limited to all fees and charges of Engineers, architects, <br />attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) sustained by <br />Contractor on or in connection with any other project or <br />anticipated project. <br /> <br />E. Contractor shall not be entitled to an <br />adjustment in Contract Price or Contract Times for delays <br />within the control of Contractor. Delays attributable to <br />and within the control of a Subcontractor or Supplier shall <br />be deemed to be delays within the control of Contractor. <br /> <br />ARTICLE 13 TESTS AND INSPECTIONS; <br />CORRECTION, REMOVAL OR ACCEPTANCE OF <br />DEFECTIVE WORK <br /> <br />13.01 Notice of Defects <br /> <br />A. Prompt notice of all defective Work of which <br />Owner or Engineer has actual knowledge will be given to <br />Contractor. All defective Work may be rejected, <br />corrected, or accepted as provided in this Article 13. <br /> <br />13.02 Access 10 Work <br /> <br />A. Owner, Engineer, their consultants and other <br />representatives and personnel of Owner, independent <br />testing laboratories, and governmental agencies with <br />jurisdictional interests will have access to the Site and the <br />Work at reasonable times for their observation, <br />inspecting, and testing. Contractor shall provide them <br />proper and safe conditions for such access and advise <br />them of Contractor's Site safety procedures and programs <br />so that they may comply therewith as applicable. <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright @ 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 34 <br /> <br />I <br /> <br />04/08 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.