My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.2 The Bidding Documents were prepared to present an essentially accurate <br />representation of existing conditions, interpreted from available information <br />on the site. The Bidder is not relieved, however, of the responsibility of <br />becoming fully informed as to existing conditions at the site. <br /> <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, <br />and streets to determine all conditions; which will affect the Work. <br /> <br />4. <br /> <br />INTERPRETATION OF BIDDING DOCUMENTS <br /> <br />4.1 All questions requiring clarification or interpretation of the Bidding <br />Documents shall be made in writing and shall reach the office of the Owner <br />at least 5 days prior to the date for receipt of bids. Direct all requests to the <br />attention of the Project Engineer at Calvin, Giordano & Associates, Inc., <br />1800 Eller Drive Suite 600, Fort Lauderdale, FL 33316; Fax: 954-921-8807; <br />Phone: 954-921-7781. <br /> <br />4.2 Any modification or interpretation of the Bidding Documents will be made by <br />Addendum to all who are recorded by the Engineer as having received a <br />complete set of Bidding Documents. <br /> <br />4.3 Interpretations or modifications of Bidding Documents made In any manner <br />other than by Addendum will not be binding. <br /> <br />4.4 A Bidder, prior to submitting his Bid, shall ascertain that he has received all <br />Addenda issued, and shall acknowledge their receipt in the Bid Form. <br /> <br />5. <br /> <br />SUBSTITUTIONS <br /> <br />5.1 Bidders represent that their Bid is based upon the materials and equipment <br />described in the Bidding Documents. <br /> <br />5.2 Requests for substitutions will be considered prior to receipt of bids if they <br />reach the Engineer at least 5 days prior to the date for receipt of bids. <br /> <br />5.3 Acceptance by the Engineer of a proposed substitution will be issued in the <br />form of an Addendum or Substitution Request Form. <br /> <br />6. <br /> <br />QUALIFICATION OF BIDDERS <br /> <br />6.1 If requested, the Bidder shall submit to the Engineer, prior to award of <br />contract, a properly completed Contractors Qualification Statement, along <br />with any other evidence of his satisfactory experience and ability to perform <br />the proposed Work. <br /> <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial <br />statement, prepared within the past 30 days, indicating current financial <br />resources, liabilities, capital equipment, and past history performance. <br /> <br />04/08 <br /> <br />00100-2 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.