My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Project or not, will pass to Owner no later than the time of <br />payment free and clear of all Liens. <br /> <br />14.04 Substantial Completion <br /> <br />A. When Contractor considers the entire Work <br />ready for its intended use Contractor shall notify Owner <br />and Engineer in writing that the entire Work is <br />substantially complete (except for items specifically listed <br />by Contractor as incomplete) and request that Engineer <br />issue a certificate of Substantial Completion. <br /> <br />B. Promptly after Contractor's notification, , <br />Owner, Contractor, and Engineer shall make an <br />inspection of the Work to determine the status of <br />completion. If Engineer does not consider the Work <br />substantially complete, Engineer will notify Contractor in <br />writing giving the reasons therefor. <br /> <br />C. If Engineer considers the Work substantially <br />complete, Engineer will deliver to Owner a tentative <br />certificate of Substantial Completion which shall fix the <br />date of Substantial Completion. There shall be attached to <br />the certificate a tentative list of items to be completed or <br />corrected before final payment. Owner shall have seven <br />days after receipt of the tentative certificate during which <br />to make written objection to Engineer as to any provisions <br />of the certificate or attached list. If, after considering such <br />objections, Engineer concludes that the Work is not <br />substantially complete, Engineer will within 14 days after <br />submission of the tentative certificate to Owner notify <br />Contractor in writing, stating the reasons therefor. If, after <br />consideration of Owner's objections, Engineer considers <br />the Work substantially complete, Engineer will within <br />said 14 days execute and deliver to Owner and Contractor <br />a definitive certificate of Substantial Completion (with a <br />revised tentative list of items to be completed or correct- <br />ed) reflecting such changes from the tentative certificate <br />as Engineer believes justified after consideration of any <br />objections from Owner. <br /> <br />D. At the time of delivery of the tentative <br />certificate of Substantial Completion, Engineer will <br />deliver to Owner and Contractor a written recommen- <br />dation as to division of responsibilities pending final <br />payment between Owner and Contractor with respect to <br />security, operation, safety, and protection of the Work, <br />maintenance, heat, utilities, insurance, and warranties and <br />guarantees. Unless Owner and Contractor agree otherwise <br />in writing and so inform Engineer in writing prior to <br />Engineer's issuing the definitive certificate of Substantial <br />Completion, Engineer's aforesaid recommendation will <br />be binding on Owner and Contractor until final payment. <br /> <br />E. Owner shall have the right to exclude <br />Contractor from the Site after the date of Substantial <br />Completion subject to allowing Contractor reasonable <br />access to complete or correct items on the tentative list. <br /> <br />14.05 Partial Utilization <br /> <br />A. Prior to Substantial Completion of all the <br />Work, Owner may use or occupy any substantially <br />completed part of the Work which has specifically been <br />identified in the Contract Documents, or which Owner, <br />Engineer, and Contractor agree constitutes a separately <br />functioning and usable part of the Work that can be used <br />by Owner for its intended purpose without significant <br />interference with Contractor's performance of the <br />remainder of the Work, subject to the following condi- <br />tions. <br /> <br />1. Owner at any time may request Contractor in <br />writing to permit Owner to use or occupy any such part of <br />the Work which Owner believes to be ready for its <br />intended use and substantially complete. If and when <br />Contractor agrees that such part of the Work is <br />substantially complete, Contractor will certify to Owner <br />and Engineer that such part of the Work is substantially <br />complete and request Engineer to issue a certificate of <br />Substantial Completion for that part of the Work. <br /> <br />2. Contractor at any time may notify Owner and <br />Engineer in writing that Contractor considers any such <br />part of the Work ready for its intended use and substan- <br />tially complete and request Engineer to issue a certificate <br />of Substantial Completion for that part of the Work. <br /> <br />3. Within a reasonable time after either such <br />request, Owner, Contractor, and Engineer shall make an <br />inspection of that part of the Work to determine its status <br />of completion. If Engineer does not consider that part of <br />the Work to be substantially complete, Engineer will <br />notify Owner and Contractor in writing giving the reasons <br />therefor. If Engineer considers that part of the Work to be <br />substantially complete, the provisions of Paragraph 14.04 <br />will apply with respect to certification of Substantial <br />Completion of that part of the Work and the division of <br />responsibility in respect thereof and access thereto. <br /> <br />4. No use or occupancy or separate operation of <br />part of the Work may occur prior to compliance with the <br />requirements of Paragraph 5.10 regarding property <br />msurance. <br /> <br />14.06 Final Inspection <br /> <br />A. Upon written notice from Contractor that the <br />entire Work or an agreed portion thereof is complete, <br />Engineer will promptly make a final inspection with <br />Owner and Contractor and will notify Contractor in <br />writing of all particulars in which this inspection reveals <br />that the Work is incomplete or defective. Contractor shall <br />immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br /> <br />EJCDC C-700 Standard General Conditions of the Construction Contract. <br />Copyright <Q 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br />00700 - 39 <br /> <br />04/08 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.