My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />In the first line of Paragraph 2.02. change the term ",..ten..." to read: <br /> <br />" . (6) " <br />...SIX .... <br /> <br />Delete Paragraph 2.03. and replace with the following: <br /> <br />"The date of commencement of the Work is the date established in a Notice to <br />Proceed." <br /> <br />Add the following to Paragraph 2.05.: <br /> <br />"D. CONTRACTOR shall perform no portion of the Work at any time without <br />Contract Documents or, where specified, approved Shop Drawings for such <br />portion of the Work. <br />E. By executing the Contract, CONTRACTOR represents that he has visited the <br />site, familiarized himself with the local conditions under which the Work is to be <br />performed, and correlated his observations with the requirements of the Contract <br />Documents." <br /> <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT. AMENDING. REUSE <br /> <br />Add the following to Paragraph 3.02.A.: <br /> <br />"3. Sections of Division One - General Requirements govern the execution of all <br />sections of the Specifications." <br /> <br />ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND <br />PHYSICAL CONDITIONS; REFERENCE POINTS <br /> <br />In Paragraph 4.02.A., change the term "...Supplementary Conditions..," to read: <br /> <br />"...bidding requirements...". <br /> <br />In Paragraph 4.02.8., change the term "Supplementary Conditions..." to read: <br /> <br />"...bidding requirements...". <br /> <br />ARTICLE 5 - BONDS AND INSURANCE <br /> <br />In the first line of Paragraph 5.04., following the word "...maintain...", insert the words: <br /> <br />"... in a company or companies licensed to do business in the State of <br />Florida,...". <br /> <br />In the last line of Paragraph 5.04.A.6., following the word "...vehicle.", insert the words: <br /> <br />"..., or arising out of operation of laws and regulations for damages because of <br />bodily injury or death of any person or for damage to property." <br />Add the following after Paragraph 5.04.B.7.: <br /> <br />04/08 Final Version <br /> <br />00800-2 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.