My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-05-01) Town Center Park Lighting Improvements
>
Bid Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:52 PM
Creation date
8/15/2008 3:50:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Town Center Park Lighting Improvements
Bid No. (xx-xx-xx)
08-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />b) <br /> <br />Directive or Written Amendment indicating the parties' agreement <br />with all or part of such costs for additional Work. <br />add the portion of the Contract Price properly allocable to <br />materials and equipment delivered and suitably stored at the site <br />for subsequent incorporation in the Work, or, if approved in <br />advance by Owner, suitably stored off-site at a location agreed <br />upon in writing. <br />add the Contractor's Fee, less the ten percent (10%) Retainage. <br />The Contractor's Fee shall be computed upon the Cost of the <br />Work described in the preceding clauses at the rate in accordance <br />with Paragraph 11.01.C or, if the Contractor's Fee is stated as a <br />fixed sum, then it shall be an amount that bears the same ratio to <br />that fixed-sum fee as the Cost of the Work in the two preceding <br />clauses bears to a reasonable estimate of the probable Cost of <br />Work upon completion. <br />subtract the aggregate of the previous payments made by the <br />Owner; <br />subtract the shortfall, if any, indicated by the Contractor in the <br />supporting records and other evidence as mutually agreed <br />between the Owner or Engineer and Contractor to demonstrate <br />expenditures incurred to substantiate prior Applications for <br />Payment, or resulting from errors subsequently discovered by <br />Owner, or designee; <br />subtract the amounts, if any, for which the Architect has withheld <br />or nullified Certificate for Payment in accordance with the <br />provisions of the Contract Documents." <br /> <br />c) <br /> <br />d) <br /> <br />e) <br /> <br />f) <br /> <br />In Paragraph 14.02.B., change the beginning of the sentence: from "Ten days..." to read: <br /> <br />"Forty-five days...". <br /> <br />In Paragraph 14.02.C.1, insert the following: <br /> <br />2. The Contractor shall promptly pay each subcontractor, upon receipt of <br />payment from the Owner, out of the amount paid to the Contractor on <br />account of such Subcontractor's portion of the Work, the amount to which <br />said Subcontractor is entitled, reflecting percentages actually retained from <br />payments to the Contractor on account of such Subcontractor's portion of the <br />Work. The Contractor shall, by appropriate agreement with each <br />Subcontractor, require each Subcontractor to make payments to <br />Subsubcontractors, if such Subsubcontractors are permitted by the Contract <br />Documents, to make payments to Subsubcontractors in the same manner. <br />3. Neither the Owner nor the Engineer shall have an obligation to payor see to <br />the payment of money to a Subcontractor, except as provided by law, <br />4, Payment by Contractor to material suppliers shall be treated in the manner as <br />provided in Paragraph 14.02.C.2. <br />5. Except with the Owner's prior approval, payments to Subcontractors shall be <br />subject to Retainage of not less than ten percent (10%). The Owner and the <br />Contractor shall agree upon a mutually acceptable procedure for review and <br />approval of payments and retention for Subcontractors, <br /> <br />04/08 Final Version . <br /> <br />00800-8 <br /> <br />06-5723 <br />
The URL can be used to link to this page
Your browser does not support the video tag.