My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Solo Construction Corp.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
Solo Construction Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:53 PM
Creation date
8/22/2008 2:47:32 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isles Roadway and Utility Improvements
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />JUL-Uj-~UUd IHU Ul;~O rn GHLVIN & ~lUKUHNU <br /> <br />rHfi NU, U <br /> <br />r. uau~ <br /> <br />Response to RFI No. 1 <br /> <br />Atlantic Isles roadway and Utility Improvements <br />CITY OF SUNNY ISLES BEACH BID NO. 08-06-01 <br />CGA PROJECT NO. 05-4893 <br /> <br />July 3, 2008 <br /> <br />Central Florida Equipment <br /> <br />1. Bid Item No. 21 "Pavement seam joint at bridge" Please confirm that the specification for <br />this 'I seam joint" can be obtained at EE FDOT Index 1200 Sheets 1 thru 3. <br />Response: For COIJcrete to asphalt joints u,ve self-leveling silicone or hot pour <br />sealant per FDOT Flexible Pavement Manual (latest edition). <br /> <br />American En~ineering <br /> <br />1. My asphalt subcontractor tells me that type FC 12.7 does not exist and perhaps it should <br />be FC 12.5, In any case) an FC or friction course mix is not normally placed 2 inches <br />thick. Usually a I" or 1.25" structure asphalt would be used for the first lift and a .75" or <br />1" Fe (friction course) would be used for the second lift. A 2" of type FC (Friction <br />course) asphalt is probably not going to give the City the structural integrity or longevity <br />that they expect. Please confinn the asphalt section required for this road work. <br />Response: 2'. FDOT Superpave Type SP12.5 Asphaltic Concrete. <br /> <br />2. If possible, could we have two separate line items to replace bid item #9-Green Areas in <br />ROW, including fine grade and sod? The green area earthwork is relatively minor and it <br />will be problematic to determine a precise CY quantity in the field. This is one item that <br />can probably best be handled as a slump sum item. Then the sod should be handled as a <br />separate line item by the SF for the actual quantity of sod installed in place. Sod in place <br />is easily measured in the field and then the City pays only for sod actually installed and <br />the contractor doesn't have to carry a large contingency for possible sod requirements. <br />Response: No <br /> <br />3. The bid doc\.unents require that the contractor pay for pennits. Does this include the City <br />of Smmy Isles Beach fees or will these fees be waived? If they are to be included, can <br />you include a City permit fee schedule in the next addendwn? <br />Response: Need to getfee sclledulejrom City's wehsite or Building Department. <br /> <br />4. The RTU unit is said to be included in the base bid but there is not specification on what <br />model or what program to be used for the RTU unit. A specitlcation is needed. <br />Respo1lse: RTU is part of the lift statiolJ package designated as a lump sum bid. <br /> <br />RFI Rcponscs <br /> <br />05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.