Laserfiche WebLink
<br /> <br />SECTION 00300 <br />Adm'" 5 <br />BID FORM <br /> <br />Bid of JVA ~Y\3\Y)-(o1nj tor1~127c. <br />Address q71t{; SlA) --z4 stl tFZ~ M~arn/, FL 331b5 <br />Phone 305. 55 ~ . 5 } 1-f <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with <br />the Contract Documents for construction of: sanitary sewer collection system with <br />gravity sewer lines, manholes, WASD Lift Station and Force main; Paving, Grading, and <br />Drainage improvements; Under grounding of certain utilities, such as FPL Power, <br />CATV, and Telephone will require coordination with others. The installation of a new <br />water main with services is also proposed by the City of North Miami Beach to be <br />constructed contemporaneously, but not as a part of this contract located in the CITY <br />OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of <br />the proposed work and is familiar with the nature and extent of the work and any local <br />conditions that may in any manner affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by <br />the Bidding Documents, in the manner prescribed therein and to the standards of quality <br />and performance established by the Engineer for the unit price amounts stated in the <br />spaces herein provided, for each of the items or combination of items stipulated. Unit <br />price line items shall include cost of implementing all applicable safety requirements. <br />Bidder acknowledges that estimated quantities scheduled are approximated for the sole <br />purpose of obtaining comparative bids for determination of the lowest responsible and <br />responsive bidder whose bid best serves the interest of, and represents the best value <br />to, the Owner pursuant to the criteria set forth in Section 62-8 of the City Code, and that <br />actual quantities required may increase or decrease. Bidder further agrees that <br />payments will be made on the basis of actual quantities placed and accepted in the <br />construction. Bidder acknowledges that price is only a factor in determining the lowest <br />responsible and responsive bidder. <br /> <br />RECEiVED r" <br />\~ <br />J U L 0 7 2008 \; <br /> <br />City of sunny lalee BG9Ch <br />Office ollhe CI Clerk <br /> <br />05/08 <br /> <br />00300- ] <br /> <br />05-4893 <br />