Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />SECTION 00300 <br /> <br />BID FORM <br /> <br />Bid of Jtmer / can Engi ne-eYlngJ [Jev. <br />Address "7lJ75 \1\1. o Kt: cc..ho bee Rd. HulJeah 6avoeYJS, FI 330/8 <br />Phone C3 OS) S25 q ~D 0 <br />. <br /> <br />To furnish all materials, equipment and labor and to perform all work in accordance with <br />the Contract Documents for construction of: sanitary sewer collection system with <br />gravity sewer lines, manholes, WASD Lift Station and Force main; Paving, Grading, and <br />Drainage improvements; Under grounding of certain utilities, such as FPL Power, <br />CATV, and Telephone will require coordination with others. The installation of a new <br />water main with seNices is also proposed by the City of North Miami Beach to be <br />constructed contemporaneously, but not as a part of this contract located in the CITY <br />OF SUNNY ISLES BEACH. <br /> <br />To: CITY OF SUNNY ISLES BEACH <br />18070 Collins Avenue, Suite 250 <br />Sunny Isles Beach, Florida 33160 <br /> <br />The undersigned Bidder has carefully examined the Bidding Documents and the site of <br />the proposed work and is familiar with the nature and extent of the work and any local <br />conditions that may in any manner affect the work to be done. <br /> <br />The undersigned Bidder agrees to do all the work and furnish all materials called for by <br />the Bidding Documents, in the manner prescribed therein and to the standards of quality <br />and performance established by the Engineer for the unit price amounts stated in the <br />spaces herein provided, for each of the items or combination of items stipulated. Unit <br />price line items shall include cost of implementing all applicable safety requirements. <br />Bidder acknowledges that estimated quantities scheduled are approximated for the sole <br />purpose of obtaining comparative bids for determination of the lowest responsible and <br />responsive bidder whose bid best seNes the interest of, and represents the best value <br />to, the Owner pursuant to the criteria set forth in Section 62-8 of the City Code, and that <br />actual quantities required may increase or decrease. Bidder further agrees that <br />payments will be made on the basis of actual quantities placed and accepted in the <br />construction. Bidder acknowledges that price is only a factor in determining the lowest <br />responsible and responsive bidder. <br /> <br />RECEIVED <br />JUL 0 7 2008 \\ <br /> <br />Y lsIea BeQGtl <br />City 01 sunn ClEIl'k <br />Olf'1Cll 01 the Cl <br /> <br /> <br />05/08 <br /> <br />00300-1 <br /> <br />05-4893 <br />