<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />3.3. EARL Y COMPLETION BONUS. If CONTRACTOR completes the Work prior to the <br />substantial completion date specified in paragraph 3.1 above, the CONTRACTOR will be eligible 10 <br />receive an early completion bonus in the sum ofTwo Thousand and 00/100 dollars ($2000.00) per <br />day for each day the Work is complete prior to the substantial completion date specified in <br />paragraph 3.1, up to a maximum amount of Sixty Thousand and 00/100 dollars ($60,000.00). <br /> <br />Article 4. CONTRACT PRICE. <br /> <br />OWNER shall pay CONTRACTOR for completion of the Work. in accordance with the Contract <br />Documents an amount in current funds equal to the sum of the amounts determined pursuant to <br />paragraphs 4,1 below: <br /> <br />4.1. FOR A LUMP SUM CONTRACT OF: <br /> <br />TOTAL BASE BID (Lump sum, Unit prices, and contingency items) <br />Three Million One Hundred Twenty Six Thousand Five Hundred Fourty Four Dollars & Seventy One Cents <br /> <br />(use words) <br /> <br />($ 3,126,544.71 <br />fig urea <br /> <br />As provided in paragraph 11,03 of the General Conditions estimated quantities are not guaranteed, and <br />determinations of actual quantities and classification are to be made by ENGINEER as provided in <br />paragraph 9,08 of the General Conditions. Unit prices have been computed as provided in paragraph <br />11,03.8 of the General Conditions. <br /> <br />Article 5. PAYMENT PROCEDURES. <br /> <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General <br />Conditions. Applications for Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br /> <br />5.1. Progress Payments; Retalnage. OWNER shall make progress payments on account of <br />the contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by <br />ENGINEER, on or about the ~ day of each month during construction as provided in paragraphs <br />5.1.1. and 5,1.2. below, All such payments will be measured by the schedule of values established <br />in paragraph 2.07 of the General Conditions (and in the case of Unit Price Work based.on the. <br />number of units completed) or, in the event there is no schedule of values, as provided in the <br />General Requirements. <br /> <br />5.1.1. Prior to Substantial Completion, progress payments will be made in an amount <br />equal to the percentage indicated below, but, in each case, less the aggregate of <br />payments previously made and less such amounts as ENGINEER shall determine, or <br />OWNER may withhold, in accordance with paragraph 14.02 of the General Conditions. <br /> <br />~ % of Work completed (with the balance being retainage). If Work has been <br />50% completed as determined by ENGINEER, and if the character and progress <br />of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on <br />recommendation of ENGINEER, may determine that as long as the character and <br />progress of the Work remain satisfactory to them, there will be no additional <br />retainage on account of Work completed, in which case the remaining progress <br />payments prior to Substantial Completion will be in an amount equal to 100% of <br />the Work completed, <br /> <br />.J!L % (with the balance being retainage) of materials and equipment not <br />incorporated in the Work (but delivered, suitably stored and accompanied by <br />documentation satisfactory to OWNER as provided in paragraph 14,02 of the <br />General Conditions and within Section 9-6.5 partial payments as provided in <br />FOOT Standard Specifications for Road and Bridge Construction. <br /> <br />05/08 Final Version <br /> <br />00500-2 <br /> <br />05-4B93 <br />