My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tenex Enterprises, Inc. #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
Tenex Enterprises, Inc. #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 1:49:52 PM
Creation date
8/25/2008 9:33:51 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isle Roadway and Utility Improvements
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />TENEX ENTERPRISES, INC. <br />NOTES TO FINANCIAL STATEMENTS <br />FOR THE SIX MONTHS ENDED JUNE 30, 2007 <br /> <br />NOTE A - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES <br /> <br />Business Activitv <br /> <br />The Company performs constmction and repairs of major roads, airport mnways and aprons, <br />parking lots, sidewalks, curb and gutters, and storm drainage facilities including any excavating, <br />clearing, grading and concrete work necessary and incidental thereto. <br /> <br />Management uses estimates and assumptions in preparing these financial statements in <br />accordance with generally accepted accounting principles. Those estimates and assumptions <br />affect the reported amounts of assets and liabilities, the disclosure of contingent assets and <br />liabilities, and the reported revenues and expenses. Actual results could vary from the estimates <br />that were used. <br /> <br />Revenue and Cost Recognition <br /> <br />The Company recognizes revenues from fixed-price and modified fixed-price constmction <br />contracts on the percentage-of-completion method, measured by the percentage of cost incurred <br />to date to estimated total cost for each contract. That method is used because management <br />considers total cost to be the best available measure of progress on the contracts. Because of <br />inherent uncertainties in estimating costs, it is at least reasonably possible that the estimates used <br />will change within the near term. <br /> <br />Contract costs include all direct material and labor costs and those indirect costs related to <br />contract performance, such as indirect labor, supplies, tools, repairs, and depreciation. Selling, <br />general, and administrative costs are charged to expense as incurred. Provisions for estimated <br />losses on uncompleted contracts are made in the period in which such losses are determined. <br />Changes in job perfonnance, job conditions, and estimated profitability may result in revisions <br />to costs and income, which are recognized in the period in which the revisions are determined. <br /> <br />The asset, "Costs and estimated eamings in excess of billings on uncompleted contracts," <br />represents revenues recognized in excess of amounts billed. The liability, "Billings in excess of <br />costs and estimated eamings on uncompleted contracts," represents billings in excess of revenues <br />recognized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.