My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tenex Enterprises, Inc. #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
Tenex Enterprises, Inc. #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 1:49:52 PM
Creation date
8/25/2008 9:33:51 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isle Roadway and Utility Improvements
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />~ <br /> <br />Bid <br />Item <br /> <br />Description <br /> <br />Estimated <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Estimated Total <br /> <br /> F Lift Station <br /> 49 Compl~te as per plans to include but not limited <br /> to labor, equipment, materials, electric, q(POOO q 0 000 <br /> mechanical, earthwork, etc LS $ $ <br /> G Pavement Marking, Striping and Signage <br /> 50 18" yellow solid line 76 LF $ 3 $ ~..?.~ <br /> 5118"whitesolidline 290 LF $ 3 $ ~.,O <br /> 52 24" stop bar 18 LF $ "\ $ \A6 <br /> 53 6" double yellow 122 LF $ q $ \.,'l~ <br /> 54 8" white 10'-30' skip 0.50 GM $ 4000 $ ~ 1,)00 <br /> 55 8" white solid line 351 LF $ ~ $ 2..ftJb <br /> 56 RPM amberlamber 85 EA $ 5t:) $ if :J...!5 <br /> 57 RPM bluelblue 6 EA $ $ .30 <br /> 58 R5-1 (Do Not Enter) 3 EA $ 1 '5& $ if 50 <br /> 59 R6-1 L (One Way) 1 EA $ /5 0 $ 1.50 <br /> 60 R6-1 R (One Way) 3 EA $ (50 $ 4- ~() <br /> 61 R3-1 (No Right Turn) 1 EA $ I?O $ '5D <br /> 62 R1-2 (Yield) 1 EA $ ISa $ ISo <br /> Subtotal-Civil $1 iiC/o 0'58, () 0 <br />.~ . . <br /> III. Electrical - Street Lighting 5 co ~5oo <br /> 63 Furnish and install decorative light pole cost 33 EA $ '-I $ I 'I <br /> 64 Furnish and install decorative light fixture cost 33 EA $ I ~ 0 0 $ ~ J~oo <br /> 65 Wiring of light fixtures 33 EA $ tl..DO $ ~6nn <br /> 66 Copper wiring (As per Plans) 16,000 LF $ , $ 16(!)co <br /> 67 Furnish and install 2" schedule 40 PVC conduit to <br /> include trenching (6" x 12" deep), backfill and 8&?OO <br /> restoration 4,000 LF $ :L $ <br /> 68 Handholes 33 EA $ 3~o $ 9 q mo <br /> 69 Copper clad ground rods (5/8" dia x 10'L) 33 EA $ 3c $ qq" <br /> 70 Panel & Meter Enclosure, including connection to 3$oa $ 3 500 <br /> service point LS $ <br /> Subtotal-Electrical $ 1.:1.. b 4 9' " <br /> IV. North Miami Beach Water Main Installation <br /> 71 Mobilization, General Conditions (Only for items in 5($)DO 5tOoo <br /> IV Installation of Water Main System) LS $ $ <br /> 72 Abandonment I Removal of Existing Water 5 SOlD 0 <br /> System 1 LS $ 00 D $ <br /> -73 Install 8" PVC Pipe C-900 2,560 LF $ '-!fJ $ ItJ;J..'f()O <br /> 74 Install 6" PVC Pipe C-900 420 LF $ 3S $ ly 100 <br />--- 75 Install 4" Polyethylene Casing Pipe 85 LF $ "-6 $ /700 <br /> 76 Install 2" Polyethylene Casing Pipe 770 LF $ ~o $ .1..J'~o <br /> 77 55 straps 10 EA $ -:-\5" $ 3Sotl <br /> 78 Install Fire Hydrants 6 EA $ :l .5 (p C'\ $ \5a7~1\ <br /> 05/D8-Addendum NO.5 00300-4 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.