Laserfiche WebLink
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />Bid <br />Item <br /> <br />Description <br /> <br />Estimated <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Estimated Total <br /> <br />F Lift Station <br />49 Complete as per plans to include but not limited <br /> to labor, equipment, materials, electric, <br /> mechanical, earthwork, etc LS $ 15'1/ ffl.40 $ /5<1., 67C1 40 <br />G Pavement Marking, Striping and Signage <br /> 50 18" yellow solid line 76 LF $ 3.$ $ 23/. fO <br /> 51 18" white solid line 290 LF $ 3.th $ ~84..Q) <br /> 52 24" stop bar 18 LF $ l?S6 $ 1~4.og <br /> 53 6" double yellow 122 LF $ Z. trg $ 3?~q6 <br /> 54 8" white 10'-30' skip 0.50 GM $ ~ 069, 6t) $ ~~7, &"0 <br /> 55 8" white solid line 351 LF $ 1.7? $ 'I -:>1. ?: ~ <br /> 56 RPM amber/amber 85 EA $ 6. 42 $ ,;;45.;n <br /> 57 RPM blue/blue 6 EA $ 2/.40 $ /2'1.40 <br /> 58 R5-1 (Do Not Enter) 3 EA $ 251. 4S $ ?sQ.3S <br /> 59 R6-1L (One Way) 1 EA $ 4~/.so $ 4xl. 50 <br /> 60 R6-1 R (One Way) 3 EA $ 4~/. 9:) $ ( 444 CXJ <br /> 61 R3-1 (No Right Turn) 1 EA $ 25/.45 $ 25/.45 <br /> 62 Rl-2 (Yield) 1 EA $ 4i/. SO $ 4f?/. GO <br /> Subtotal-Civil $ 55. 6'g). Z9- <br />III. Electrical - Street Lighting <br /> 63 Furnish and install decorative light pole cost 33 EA $ 5. ~CA 6t- $ Iq~,b54 II <br /> 64 Furnish and install decorative light fixture cost 33 EA $ 1,/51. qS $ 4 ~ ~/4 ~~ <br /> 65 Wiring of light fixtures 33 EA $ 1" 41'>4 ~I $ 4h; :,>c;5'. 4.3 <br /> 66 Copper wiring (As per Plans) 16,000 LF $ .3. 2.5 $ C;2 OO?m <br /> 67 Furnish and install 2" schedule 40 PVC conduit to <br /> include trenching (6" x 12" deep), backfill and $ t.,q, 4'in tn <br /> restoration 4,000 LF $ f C. 3? <br /> 68 Handholes 33 EA $ ~ 7. I S'j $ :;;; 31 Z. l.t?- <br /> 69 Copper clad ground rods (5/8" dia x 10'l) 33 EA $ 24~.()1 $ ~. I gLJ 33 <br /> 70 Panel & Meter Enclosure, including connection to $ I ~ 833.26 $/~.9~3.26 <br /> service point LS <br /> Subtotal-Electrical $ 410,{)\~ 9~ <br />IV. North Miami Beach Water Main Installation <br /> 71 Mobilization, General Conditions (Only for items in <br /> IV Installation of Water Main System) LS $ J(( +ZQ()() $ /6 =i-zo.CO <br /> . <br /> 72 Abandonment / Removal of Existing Water <br /> System 1 LS $ 0, q/().f;o $ 6:~5o.(Y) <br /> 73 Install 8" PVC Pipe C-900 2,560 LF $ ?~.q~ $ ~ /9h. 40 <br /> 74 Install 6" PVC Pipe C-900 420 LF $ 2'1 7'1 $ /I, ~~J 'f() <br /> 75 Install 4" Polyethylene Casing Pipe 85 LF $ Sq, ZR $ 5;0311. ~6 <br /> 76 Install 2" Polyethylene Casing Pipe 770 LF $ 3/. 2.t $ 24. ()7/.IO <br /> 77 S5 straps 10 EA $ YZ'1./0 $ 4ZC1/ Q1 <br /> 78 Install Fire Hydrants 6 EA $ ~~m.{X) $ (~-:+zom <br />05/08-Addendum No.5 00300-4 05-4893 <br />