My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Conquest Engineering Group Company
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Responses
>
Conquest Engineering Group Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:56 PM
Creation date
8/25/2008 9:57:32 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Atlantic Isles Roadway and Utility Improvements
Bid No. (xx-xx-xx)
08-06-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Atlantic Isles Roadway and Utility Improvements <br /> <br />Bid <br />Item <br /> <br />Description <br /> <br />Estimated <br />Quantity Unit <br /> <br />Unit Price <br /> <br />Estimated Total <br /> <br /> F Lift Station <br /> 49 Complete as per plans to include but not limited <br /> to labor, equipment, materials, electric, 1(j;{;,544.(t) /~544,CO <br /> mechanical, earthwork, etc LS $ $ <br /> G Pavement Marking, Striping and Sign age <br /> 50 18" yellow solid line 76 LF $ ..3.00 $ f?28.aJ <br /> 51 18" white solid line 290 LF $ :3.00 $ f1370. ~ <br /> 52 24" stop bar 18 LF $ 515.50 $ 999. a? <br /> 53 6" double yellow 122 LF $ /.50 $ I ~3.00 <br /> 54 8" white 10'-30' skip 0,50 GM $ 112.00 $ 6..00 <br /> 55 8" white solid line 351 LF $ 1.00 $ 351.00 <br /> 56 RPM amber/amber 85 EA $ 7;00 $ 59'5.<<J <br /> 57 RPM blue/blue 6 EA $ /':00 $ 4g00 <br /> 58 R5-1 (Do Not Enter) 3 EA $ ..332. C() $ 99~. 00 <br /> 59 R6-1 L (One Way) 1 EA $ 178.00 $ /78. CO <br /> 60 R6-1 R (One Way) OR\GINAL 3 EA $ 27rP.50 $ 629. 50 <br /> 61 R3-1 (No Right Turn) 1 EA $ 27f;,.50 $ 27<0. !50 <br /> 62 R 1-2 (Yield) EA $ 27~.~ $ 27G. t:.V <br />" I, Ci5?;286,OO <br /> Subtotal-Civil $ <br /> . <br /> III. Electrical - Street Lighting <br /> 63 Furnish and install decorative light pole cost 33 EA $ 4,~4. 00 $ /43,()~"W <br /> 64 Furnish and install decorative light fixture cost 33 EA $ 4,BM.oo $ /43,C22.CO <br /> 65 Wiring of light fixtures 33 EA $ I, (324. 00 $ ~/'12.. 00 <br /> 66 Copper wiring (As per Plans) 16,000 LF $ .3.40 $ 5 ,4CO.OO <br /> 67 Furnish and install 2" schedule 40 PVC conduit to <br /> include trenching (6" x 12" deep), backfill and /2.00 - 48<<0,,00 <br /> restoration 4,000 _LF -$ - - $ <br /> 68 Handholes 33 EA $ 456.00 $ /5. 048.()() <br /> 69 Copper clad ground rods (5/8" dia x 10'L) 33 EA $ /qg,tXJ $ <O~.3.%.OO <br /> 70 Panel & Meter Enclosure, including connection to 17; 760, (X) 1 7;TBJ. a? <br /> service point LS $ $ <br /> Subtotal-Electrical $ 48'0780.00 <br /> IV. North Miami Beach Water Main Installation <br /> 71 Mobilization, General Conditions (Only for items in ~805,OO ~ 305. ()() <br /> IV Installation of Water Main System) LS $ $ <br /> 72 Abandonment / Removal of Existing Water ~ 695.cv ~ 885. 0() <br /> System 1 LS $ $ <br /> 73 Install 8" PVC Pipe C-900 2,560 LF $ 23. a? $ .58, 8eo.00 <br /> 74 Install 6" PVC Pipe C-900 420 LF $ 2P,50 $ C(4f%).W <br /> 75 Install 4" Polyethylene Casing Pipe 85 LF $ /2,!JO $ ~ OELI. 00 <br /> 76 Install 2" Polyethylene Casing Pipe 770 LF $ ZOO $ 6;39'o.a? <br />'- 77 SS straps 10 EA $ /94.00 $ 11140.00 <br /> 78 Install Fire Hydrants 6 EA $ 3,822"ct) $ ,932.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.