My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Metric Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-10-01) Prof. Svcs. for Emergency Debris Disposal Mgmt.
>
Responses
>
Metric Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:56 PM
Creation date
8/14/2008 12:24:44 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Svcs. for Emergency Debris Disposal Mgmt.
Bid No. (xx-xx-xx)
07-10-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. 12.NAME <br />W. DeWayne Ray, P. E. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. a <br />. <br />. <br />. <br />. <br />. <br />. b <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. d <br />. <br />. <br />. <br />. <br />. <br />. e <br />. <br />. <br />. <br />. <br />. <br /> <br /> <br /> <br />" <br /> <br /> <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE <br />AND DISCIPLINE) <br />Florida, Professional Engineer - Civil <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) USACE Construction <br />Quality Mgmt. for Contractors; Quality Control Mgr.; Advanced MOT Supervisor; Approved FOOT Instructor for CTQP Asphalt <br />Paving and Plant Level II; Asphalt Mix Designer; Final Estimates Level II; Asphalt Plant & Roadway Technician, Level II <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Hurricane Dennis Emergency Contract <br />FOOT-District Three, Chipley, Florida <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />November, 2005 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm <br /> <br />Senior Project Engineer for Hurricane Dennis Emergency Contract in Escambia and Santa Rosa Counties. Coordinated with the FOOT, FEMA, <br />FHWA and city/county governments in the administration of this contract. Implemented/managed the utilization of over 75 subcontracted debris <br />field monitors/inspectors in a two-county area including coordination of all subcontract provisions and resolution of all personnel human <br />resources issues. These duties includea monitoring inspector performance reviews and timesheeVpayroll verification. He assisted Project <br />Administrator by directing both Metric and subcontracted field supervisors in area assignments and scheduling. Mr. Ray also conducted debris <br />collection compliance reviews and resolved conflicts when reported by inspectors and FOOT. (Estimated contract cost: $16.8M) <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />o Check if project performed with current firm <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />c <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />o Check if project performed with current firm <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />o Check if project performed with current firm <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If <br />Applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br />o Check if project performed with current firm <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.