My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Malcolm Pirnie
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-10-01) Prof. Svcs. for Emergency Debris Disposal Mgmt.
>
Responses
>
Malcolm Pirnie
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:57 PM
Creation date
8/14/2008 12:29:38 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Svcs. for Emergency Debris Disposal Mgmt.
Bid No. (xx-xx-xx)
07-10-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />City of Sunny Isles Beach S <br />Professional Services for Emergency Debris Disposal Management . <br /> <br />J Recreational Vehicles - staged in campgrounds or <br />on large tracts of land provided for under separate <br />contractual arrangements. <br /> <br />::J Hotels - As available. <br /> <br />, Rental Properties - Utilize short & long-term lease <br />arrangements for houses and apartments. <br /> <br />::I Commuting from nearby unaffected areas. <br /> <br />:I Utilize local residents when feasible, <br /> <br />, Construct base camp. <br /> <br />Vehicles <br /> <br />Our team has existing <br />contracts with several national <br />rental car agencies. We can <br />also access our national bank <br />of fleet vehicles if local rental <br />companies cannot fulfill our <br />request. <br /> <br /> <br />Power Outage Solutions <br /> <br />We have the resources and equipment to provide for <br /> <br />electrical power by alternate means, including: <br /> <br />, Generators <br />, Batteries <br />.J Solar Panels <br />::I Vehicles <br />We are self-sufficient and have the capability to deploy <br />to completely "dark" areas that are without electrical <br />power, telephones, cable communications, and potable <br />water. <br /> <br />Communications <br /> <br />:::J Phones: We have an <br />existing contract with a <br />national cellular phone <br />provider that provides <br />us with the capability <br />to provide cellular <br />phones to all QA <br />monitors, If requested, <br />these phones can be <br />activated to provide GPS coordinates and provide a <br /> <br /> <br />M903301 / WHI <br /> <br />~ <br /> <br />tracking report for the location of each QA Monitor. <br />Additionally we provide satellite phones to key <br />personnel. <br /> <br />:J Internet: We utilize an intranet and internet and <br />have in-house IT Support capable of solving typical <br />access issues. This service can be satellite or land- <br />line based depending upon the status in the affected <br />area. <br /> <br />Fuel <br /> <br /> <br />We have the resources and ability to <br />provide for large scale independent fuel <br />deliveries to our base of operations and <br />smaller scale deliveries to individual QA <br />Monitors. <br /> <br />Food and Consumables <br /> <br />We have the ability to provide an independent food <br />service provider that will provide us with hot and cold <br />meals on a daily basis. Additionally, we have in-house <br />resources and capabilities to provide dry goods and <br />consumable supplies on an on-call basis. We are self- <br />sufficient and can assist you if needed. <br /> <br />LEAD TIME <br /> <br />It is our SOP that upon notification by the City we shall <br />provide, within 4 to 48 hours, a minimum number of <br />Quality Assurance monitors to perform all services <br />anticipated in the RFP Scope of Work. <br /> <br />It is our position that our team has the resources and <br />assets to meet or exceed the lead time requirements <br />set by the City for this assignment. Our team is <br />strategically placed in the potential disaster affected <br />area and is supported by the combined regional and <br />national resources of our firms. We maintain a "ready <br />list" of available personnel to deploy within a few hours <br />notice. These individuals provide the core group to <br />meet the immediate needs of the City and provide us <br />with the ability to supplement the staff we will hire <br />from the local area. It is our intention to utilize as many <br /> <br />~~~ <br /> <br />INDEPENDENT ENVIRONMENTAL ENGINEERS, SCIENTISTS AND CONSULTANTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.