Laserfiche WebLink
<br />I <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />'I <br /> <br />I <br /> <br />I <br /> <br />. .. . . .-- <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />12. NAME <br />Leah K. Richter <br /> <br />13. ROLE IN THIS CONTRACT <br />Recovery Operations <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b, WITH CURRENT FIRM <br /> <br />10 10 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Malcolm Pirnie, Inc., Fort Lauderdale FL <br />16. EDUCATION (DEGREE AND SPECIAUZA nON) <br />BS (Environmental Engineering) 1997; University of Florida <br />, 'r ') '),' '" <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.) <br />Ms, Richter is responsible for security vulnerability assessments and emergency <br />response planning for water treatment facilities. Trained in the EPA-sponsored Risk <br />Assessment Methodology for Water (RAM-W), Ms. Richter has provided guidance <br />to numerous water facilities in the preparation of vulnerability assessments and <br />emergency response plans under the Bioterrorism Act. Ms. Richter also has a <br />diverse background in environmental engineering including experience in solid <br />waste management, waste-to-energy facility monitoring, contract administration. <br />debris management. environmental regulatory compliance management, water <br />su I and treatment, water ualit ,and wastewater collection and treatment. <br />19. RELEVANT PROJECTS <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br />DISCIPLINE) <br />Professional Engineer, FL <br /> <br />- - --- - - <br />SPECIALIZED EXPERIENCE <br /> <br />Trained in the EPA-sponsored Risk <br />Assessment Methodology for Water (RAM-W) <br />Diverse background in environmental <br />engineering <br />Experience in solid waste management, waste- <br />to-energy facility monitoring, and contract <br />administration <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palm Beach County Solid Waste Authority: Debris Management, West PROFESSIONAL SERVICES I <br /> Palm Beach FL 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Served as Deputy Project Manager for the $50 million debris management program in the wake of Hurricanes Frances and <br />a, Jeanne in 2004 and Operations Manager following Hurricane Wilma in 2005, Responsible for the on-site coordination with the <br /> Authority, debris management contractors, and local/federal regulatory agencies, Coordinating the efforts of 100+ staff to <br /> collect approximately 6 million cubic yards of hurricane debris, Activities included load ticket database analysis/reconciliation; <br /> equipment certification/audit; load and debris site monitoring; customer complaint tracking; and gated communities claim <br /> tracking. Fees: $4,093,141 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Waste and Recycling Services: Broward County Solid PROFESSIONAL SERVICES I <br /> Waste, Ft. Lauderdale FL Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />b. Served as project engineer for the development of improvement alternatives for the County's Household Hazardous Wasle <br />Facility, The Facility is one of the few elements of the County's solid waste system that is used directly by the residents, Its <br /> appearance is therefore a reflection on the County itself; thus this project was highly visible, Prepared several conceptual <br /> design alternatives focusing on: Streamlining materials receiving; Consolidating facility operations; Providing increased <br /> storage and containment capacity; Providing dedicated office/work space and accommodations for staff members, <br /> Fees: $12,807,790 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Waste and Recycling Services: South Broward County PROFESSIONAL SERVICES I <br /> Resources Recovery Ash Monofill, Broward County FL Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />C. Assisted with overseeing the construction of$7,8 Million expansion to ensure compliance with project design/specifications, <br /> The construction involved the installation of collection systems for leachate and storm water management and control. Duties <br /> included conducting daily inspections of site activities and performing quality assurance testing in various project phases, <br /> Fees: $1,084,237 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coconut Creek: Water and Wastewater Master Plan, Coconut PROFESSIONAL SERVICES I <br /> Creek FL 2003 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br /> Served as Deputy Project Manager for the development ofa Water and Wastewater Master Plan, Elements of the project <br /> included: hydraulic modeling of water distribution and wastewater transmission systems with the objectives of determining <br /> infrastructure needs to satisfy growth through build-out. fees: $125,600 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Collier County: Northeast Utility Facility Project Management Support PROFESSIONAL SERVICES I <br /> Services, Navies FL Ongoing <br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost etc.) AND SPECIFIC ROLE [XI Check il project performed with current firm <br /> Served as Deputy Project Manager for the project management support services for the design of the first phase of the <br /> Northeast Water Treatment and Water Reclamation Facilities, Elements of the project included: development and update of <br /> Proiect Management Plan and Master Proiect Schedule, Fees: $1,445,250 <br /> <br />M9033011 WHI <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />