|
<br />I
<br />
<br />II
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />'I
<br />
<br />I
<br />
<br />I
<br />
<br />. .. . . .--
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Leah K. Richter
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Recovery Operations
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b, WITH CURRENT FIRM
<br />
<br />10 10
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Malcolm Pirnie, Inc., Fort Lauderdale FL
<br />16. EDUCATION (DEGREE AND SPECIAUZA nON)
<br />BS (Environmental Engineering) 1997; University of Florida
<br />, 'r ') '),' '"
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.)
<br />Ms, Richter is responsible for security vulnerability assessments and emergency
<br />response planning for water treatment facilities. Trained in the EPA-sponsored Risk
<br />Assessment Methodology for Water (RAM-W), Ms. Richter has provided guidance
<br />to numerous water facilities in the preparation of vulnerability assessments and
<br />emergency response plans under the Bioterrorism Act. Ms. Richter also has a
<br />diverse background in environmental engineering including experience in solid
<br />waste management, waste-to-energy facility monitoring, contract administration.
<br />debris management. environmental regulatory compliance management, water
<br />su I and treatment, water ualit ,and wastewater collection and treatment.
<br />19. RELEVANT PROJECTS
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br />DISCIPLINE)
<br />Professional Engineer, FL
<br />
<br />- - --- - -
<br />SPECIALIZED EXPERIENCE
<br />
<br />Trained in the EPA-sponsored Risk
<br />Assessment Methodology for Water (RAM-W)
<br />Diverse background in environmental
<br />engineering
<br />Experience in solid waste management, waste-
<br />to-energy facility monitoring, and contract
<br />administration
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Palm Beach County Solid Waste Authority: Debris Management, West PROFESSIONAL SERVICES I
<br /> Palm Beach FL 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br /> Served as Deputy Project Manager for the $50 million debris management program in the wake of Hurricanes Frances and
<br />a, Jeanne in 2004 and Operations Manager following Hurricane Wilma in 2005, Responsible for the on-site coordination with the
<br /> Authority, debris management contractors, and local/federal regulatory agencies, Coordinating the efforts of 100+ staff to
<br /> collect approximately 6 million cubic yards of hurricane debris, Activities included load ticket database analysis/reconciliation;
<br /> equipment certification/audit; load and debris site monitoring; customer complaint tracking; and gated communities claim
<br /> tracking. Fees: $4,093,141
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Broward County Waste and Recycling Services: Broward County Solid PROFESSIONAL SERVICES I
<br /> Waste, Ft. Lauderdale FL Ongoing
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, elc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />b. Served as project engineer for the development of improvement alternatives for the County's Household Hazardous Wasle
<br />Facility, The Facility is one of the few elements of the County's solid waste system that is used directly by the residents, Its
<br /> appearance is therefore a reflection on the County itself; thus this project was highly visible, Prepared several conceptual
<br /> design alternatives focusing on: Streamlining materials receiving; Consolidating facility operations; Providing increased
<br /> storage and containment capacity; Providing dedicated office/work space and accommodations for staff members,
<br /> Fees: $12,807,790
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Broward County Waste and Recycling Services: South Broward County PROFESSIONAL SERVICES I
<br /> Resources Recovery Ash Monofill, Broward County FL Ongoing
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />C. Assisted with overseeing the construction of$7,8 Million expansion to ensure compliance with project design/specifications,
<br /> The construction involved the installation of collection systems for leachate and storm water management and control. Duties
<br /> included conducting daily inspections of site activities and performing quality assurance testing in various project phases,
<br /> Fees: $1,084,237
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Coconut Creek: Water and Wastewater Master Plan, Coconut PROFESSIONAL SERVICES I
<br /> Creek FL 2003
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br /> Served as Deputy Project Manager for the development ofa Water and Wastewater Master Plan, Elements of the project
<br /> included: hydraulic modeling of water distribution and wastewater transmission systems with the objectives of determining
<br /> infrastructure needs to satisfy growth through build-out. fees: $125,600
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Collier County: Northeast Utility Facility Project Management Support PROFESSIONAL SERVICES I
<br /> Services, Navies FL Ongoing
<br />e. (3) BRIEF DESCRIPTION (Brief scope. size. cost etc.) AND SPECIFIC ROLE [XI Check il project performed with current firm
<br /> Served as Deputy Project Manager for the project management support services for the design of the first phase of the
<br /> Northeast Water Treatment and Water Reclamation Facilities, Elements of the project included: development and update of
<br /> Proiect Management Plan and Master Proiect Schedule, Fees: $1,445,250
<br />
<br />M9033011 WHI
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|