My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eisman and Russo Consulting Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-10-01) Prof. Svcs. for Emergency Debris Disposal Mgmt.
>
Responses
>
Eisman and Russo Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:57 PM
Creation date
8/14/2008 12:42:02 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Svcs. for Emergency Debris Disposal Mgmt.
Bid No. (xx-xx-xx)
07-10-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />E&.1m1m <br />~~16l11 <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Administrator <br /> <br />a. TOTAL <br />32 <br /> <br />I b. WITH CU~RENT FIRM <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Target Engineering Group, Inc. Miami FI. <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />Associate Science Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION <br />(STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />FOOT Traffic Control Plan Designer OSHA 40 Hour Certification <br />ATTSA Traffic Supervisor Certified Multi-line Earthwork <br />CTPQ Final Estimates EMS Engineering Menu Systems/ FOOT <br />CTPQ Asphalt Paving I & II <br />CTPQ QC Manager <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Lighting Repair and Reconstruction I Hurricane Wilma PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Restoration April 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Role: Project Manager I Project Administrator: Scope of work includes Phase I Assessment of the hurricane damage, approving material <br /> for conventional lighting and Phase II overseeing the installation. Project also includes High Mast Lighting and Decorative Lighting <br /> throughout Broward County. The Project duration is 365 days with a cost estimated at 4 million dollars. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 836 Design Build Contract for construction of two new Toll Plazas, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> widening and reconstruction of SR 836 between NW 87'h Ave and NW September 2007 <br /> 107'h Ave <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b. Cost: 54.5 Million I Duration 22 months <br /> Position: Project Engineer I Project Administrator <br /> This fast track Design Build Project consists of building two new Toll Plazas along SR 836 on both the East & West Roadways. Providing <br /> all the wiring for the operation of the Toll Plazas and the Open Road Tolling (ORT) Gantries located along the mainline of SR 836. <br /> Additional work mix includes widening and reconstruction of SR 836 between NW 87'" Ave and NW 107'" Ave with extensive earth work, <br /> base and sub-base work, structural and friction course asphalt, drainage work, lighting and construction of specialized over lane tubular <br /> structures for signing. Finally, the project included construction of a two mile bike path along the north right-of-way. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Department of Transportation Hurricane Consultant for Districts PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Four (Broward, Palm Beach, Martin Indian River and St Lucie Counties) September 2005 <br /> and Six (Miami-Dade County) <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />C. Alter Hurricanes Jeanne and Francis Target Engineering Group, Inc as retained by the FOOT to oversee the restoration of Broward, Palm <br /> Beach, Martin, Indian River and Palm Beach Counties. Consequently after Hurricane Wilma, Target Engineering Group, Inc. was retained <br /> to oversee the restoration of Miami-Dade County. Scope of Work included contract management, documentation and inspection of debris <br /> removal, signalization assessment and repair and signing restoration. Additional work mix included review, analysis and approval of all <br /> costs submitted by impacted municipalities for reimbursement by The Federal Highway Administration (FHWA). Restoration Costs for <br /> Hurricane Jeanne and Francis in District Four exceeded 300 million. Restoration Costs for Hurricane Wilma in Miami-Dade County were <br /> 200 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> State of Florida, Turnpike Enterprise, Sawgrass Expressway, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Construction of Toll Lanes at 441 and Lyons Road Ramps and January 2005 <br /> Improvements at Sunrise and Deerfield Beach Toll Plazas, <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. Construction Costs: 7 million <br /> Duration: 2 years <br /> Scope of Work: Sawgrass Expressway modification at the Sunrise and Deeriield Main Toll Plaza to Open Road Tolling (ORT) . This work <br /> included concrete island removal, conductor and conduit installation to accommodate the ORT and roadway modification and signing. <br /> Scope of Work: Sawgrass Expressway 441 & Lyons Road Ramp Modifications. This work included adding additional concrete toll lanes new <br /> buildings for toll equipment and state of the art toll gantries. <br /> <br />AUTHORIZED FOR LOCAL REPRODUCTION <br /> <br />STANDARD FORM 330 (6/2004) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.