|
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />EBImmsI
<br />
<br />~m:.JiliI~hI:tbB
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Target Engineering Group, Inc., Miami, FL
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />
<br />14. YEARS EXPERIENCE
<br />a, TOTAL I b. WITH CURRENT FIRM
<br />12 3
<br />
<br />13. ROLE IN THIS CONTRACT
<br />Field Supervisor
<br />
<br />BA Civil Engineering, Gate Way Community Technical College
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION
<br />(STATE AND DISCIPLINE)
<br />
<br />None
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />All required CTQP Certifications, FSE Erosion & Sedimentation Control, IMSA Work Zone Safety, Troxler Nuclear Gauge Safety
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Widening and Landscaping SR 91, (Florida's Turnpike), from PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Sunrise Blvd. to Atlantic Blvd. from six to ten lanes, Broward Current
<br /> County., Ft. Lauderdale, FL
<br />a, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> A $97 million project includes the construction of two new major bridges, widening of three existing bridges and
<br /> miscellaneous roadway improvements. The Turnpike within the project limits has three 2-foot wide lanes, with 12-foot
<br /> shoulders, Specific duties on project included inspection of all bridge structures, permanent and temporary sheet pile
<br /> wall installation, Noise Wall installation including the auger cast piles, concrete pile installation, steel inspection, and
<br /> mass concrete placement.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FOOT District Six Hurricane Recovery Efforts in Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> County, Miami-Dade, FL July 2006
<br />b, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> Work included supervising and monitoring debris removal and disposal operations, traffic signalization repair, lighting
<br /> repair, and drainage cleaning. Duties included contract management, inspection and documentation of contractor's
<br /> activities and processing contractor's payment.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida's Turnpike Toll SunPass Challenge Sawgrass System PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> and Toll Plazas at SR 7 IUS 441 and Lyons Road Design Build October 2005
<br /> Project., Ft. Lauderdale, FL
<br />c. i:8J Check if project performed with current firm
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
<br /> Projects include roadway, drainage, signing, construction of new plazas and toll plaza improvements at Sawgrass
<br /> Expressway in Broward County, Responsibilities include construction inspection and documentation, material testing for
<br /> verification and input of results
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Hallandale Beach Blvd Project., Ft. Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> October 2005
<br />d, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> Project included the inspection of new drainage installation, utilities, road widening, lighting and signalization,
<br /> landscaping, and miscellaneous concrete inspections.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida's Turnpike SunPass Challenge Sawgrass/SR 869 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> System and Toll Plazas at SR 7 IUS 441 and Lyons Road May 2005
<br />e, Desian Build Pro1ect., Ft. Lauderdale, FL
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i:8J Check if project performed with current firm
<br /> Projects include roadway, drainage, signing, construction of new plazas and toll plaza improvements at Sawgrass
<br /> Expressway in Broward County. Responsibilities include construction inspection and documentation material testing for
<br /> verification and input or results,
<br />
<br />AUTHORIZED FOR LOCAL REPRODUCTION
<br />
<br />STANDARD FORM 330 (6/2004) PAGE
<br />
|