My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Eisman and Russo Consulting Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Eisman and Russo Consulting Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:59 PM
Creation date
8/14/2008 4:48:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Of importance to note is E&R's 18-year history of <br />extensive involvement in the CCA/CEI business; <br />thus our ability to understand the actual costs <br />of construction and to make that transition from <br />theory (design) to reality, E&R is committed and <br />willing to meet both time and budget requirements <br />for the Projects in questions. <br /> <br />In no uncertain terms, E&R is keenly aware that <br />fluctuating economic and market conditions <br />are driving the cost of prime construction <br />materials, such as asphalt, concrete, and steel to <br />unprecedented records high, As a result, the City <br />of Sunny Isles Beach faces, more than ever, the <br />challenge to deliver sound engineering projects <br />while closely adhering to budgets and schedules, <br />which are crucial in running a successful capital <br />improvement program that meets the needs of the <br />residents of the City of Sunny Isles Beach. <br /> <br />Our qualifications and experience translates in <br />cost and time savings, while delivering superior <br />customer service to our clients. E&R is keenly <br />aware that fluctuating economic and market <br />conditions are driving the cost of prime construction <br />materials, such as asphalt, concrete, and steel, to <br />unprecedented record highs, As a result, we have <br />instituted, on a company-wide basis, a monthly <br />update of our engineer's estimate to reflect current <br />project's costs, on each design project. This <br />approach provides our clients with the flexibility <br />to either secure additional funding and/or modify <br />the project scope early on in the process without <br />compromising the safety and quality of the project. <br /> <br />The City of Sunny Isles Beach faces, more than ever, <br />the challenge to deliver sound engineering projects <br />while closely adhering to <br />budgets and schedules, <br />which are crucial in <br /> <br />. <br /> <br />running a successful capital improvement program <br />that meets the needs of the residents. <br /> <br />Please refer to the charts on Pages 13 and 14 for <br />the requested information: <br /> <br />· Comparison of Estimates and Low Bids; <br />· Compliance with Budgets; and <br />· Compliance with Schedules. <br /> <br />~. .,,,,.... '1{" <br />o . <br />. ,. <br />~ . <br />- ('\ <br />u . . I <br />. . <br />. . <br />. - . <br />". "'.),.. <br />/'. II l. i) I. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.