Laserfiche WebLink
<br />I <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Senior Geotechnical Engineer <br /> <br />112. NAME <br />Reza Javidan, P.E. <br /> <br />14. YEARS EXPERIENCE <br />a. TO;~L lb. WIT; CURRENT FIRM <br /> <br />115. FIRM NAME AND LOCATION (City and State) <br />Nutting Engineers of Florida, Inc., Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />I <br /> <br />118. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.) <br /> <br />I <br /> <br />I <br /> <br />I a, <br /> <br />I <br /> <br />University of Detroit, MI <br />M.S. Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Registered Professional Engineer <br />State of Florida #60223 <br /> <br />Florida Engineering Society <br /> <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (Cit and State) <br />Florida Power & ight, Various projects throughout Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />ongoing ongoing <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Phase 1/11 environmental property assessments, <br />Geotechnical engineering, construction materials testing <br />$75,000 <br /> <br />Check if project performed with current firm <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Various projects for Palm Beach County Engineering & <br />Public Works, Palm Beach Count , FL <br />I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />b, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br /> <br />Geotechnical engineering, construction materials testing, and <br />Special inspection services <br />$100,000 <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />PROFE2'{jML SERVICES CONSTRUCTION (If applicable) <br /> <br />Tamarac Public Service Complex, Tamarac, FL <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />C. <br /> <br />Check if project performed with current firm <br /> <br />Geotechnical engineering and construction materials testing <br />$20,000 <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Modello Condominium <br />Dania Beach, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2006 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />I d, Geotechnical engineering, earthwork operation inspections, <br />Sheet pile installation monitoring, construction materials testing, <br />Threshold inspections <br />I 50 000 <br />(1) TITLE AND LOCATION (City and State) <br /> <br />I e. <br /> <br />I <br /> <br />I <br /> <br />Check if project performed with current firm <br /> <br />Sonata Beach Club, Pompano Beach, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br /> <br /> <br />Geotechnical engineering, pile load tests, pile installation monitoring, <br />Construction materials testing <br />$75,000 <br /> <br />ST ANDARD FORM 330 (6 2004) PAGE 2 <br />