Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />12. NAME <br />Luis Rodriguez <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com Jete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Traffic and Transportation Engineer <br /> <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />7 <br /> <br />I <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC En ineerin , Inc., 7300 North Kendall Drive, #660, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />M.B.A., University of Miami, 2004 Professional Engineer, Florida #63983 <br />B.S.C.E., Universidad de Los Andes Colombia, 1999 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />I <br /> <br />I <br /> <br />19, RELEVANT PROJECTS <br /> <br />I <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW South River Drive Traffic Study PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, FL March 2006 I N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br /> Project Manager for a study to document the existing traffic characteristics and needed improvements along NW <br /> South River Drive from NW 32nd Avenue to NW 19th Street. Responsible for development and analysis the <br /> selected build alternative and preparation of the traffic report. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> DuPont Plaza Traffic Circulation Operational Analysis PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL August 2005 I N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm <br />b, Project Engineer for the development of future traffic volumes for existing one-way roadway system operations <br /> and alternative two-way operations within a four-block area of downtown Miami north of the old DuPont Plaza. <br /> Responsible for modeling and analyzing traffic circulation for both one-way and two-way operations. Also <br /> responsible for preparing a graphic comparison of obtained traffic volumes and pertinent results developed from <br /> previous studies. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 74th Street Extension PD&E Study PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, Florida April 2006 lan-Going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Engineer responsible for preparing a study documenting the requirements for the preliminary design efforts <br />c. for improvements on NW 74th Street from the Homestead Extension of Florida's Turnpike (HEFT) to S.R. 826 <br /> (Palmetto Expressway) and on NW 58th Street from the HEFT to S.R. 826, including existing conditions, typical <br /> sections, traffic analyses, necessary right-of-way, environmental impacts, and costs. The study will also be <br /> concerned with interchange alternative options. Tasks include the development of three build alternatives and the <br /> preparation of the necessary reports as per FDOT's PD&E manual, as well as a consideration of viable <br /> alternatives and alignments. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> S.R. 934 (NW/NE 79th and 81st/82nd Streets) Traffic Study PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, FL March 2007 lan-Going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d, Project Engineer responsible for traffic operations analysis including traffic forecasting and the development of <br /> different configurations for a study documenting the requirements for the preliminary design efforts for <br /> improvements on S.R. 934 from NW 13th Court to Biscayne Bay for the possible conversion of this one-way pair <br /> of streets to two-way facilities and/or other possible operational improvements. Key responsibilities included <br /> coordination of the data collection efforts, development of future traffic volumes, and traffic simulation for each one <br /> of the build alternatives and the baseline (existinq) condition. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />I <br />