My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Beiswenger, Hoch, and Associates, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Beiswenger, Hoch, and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:23:59 PM
Creation date
8/14/2008 5:02:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />.2. NAME <br />Robert J. Filusch, P.E. <br />Vice President <br />15. FIRM NAME AND LOCATION (City and State) <br />Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />PE/1977/Florida (Civil) <br />PE/1977/0hio Civil <br /> <br />Com Jete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />erson. <br /> <br />A. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />B. WITH CURRENT FIRM <br /> <br />Project Manager <br /> <br />33 <br /> <br />30 <br /> <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR-5 I Brickell Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County, FL 8/2005 10/2006 <br />a, (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Project Manager - This project in downtown Miami is the widening of SR-5 I Brickell Ave to add an additional lane over the Miami River. <br /> The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close proximity of the <br /> construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the ROW. MOT <br /> was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 3/2003 2006 <br />b. (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Project Manager - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the FEC <br /> Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three span <br /> steel I-girder bridges. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 25 I Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Hialeah, FL, Miami-Dade County 2/2004 2006 <br />C. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Project Manager - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12 million <br /> widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th Ave to <br /> W. 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required <br /> depressing roadway under existing railroad. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 869 I Sawgrass Expressway Broward County Civic Arena Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> City of Sunrise, FL, Broward County 5/1998 1999 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Project Manager - This fast track project completed in 21 months from design to construction, involved the addition of direct access ramps <br /> tolfrom SR 869 to the Office Depot Arena. Design included widening and resurfacing of mainline SR 869, widening of SR 869 toll plaza and <br /> improvements to Sunrise Blvd Interchange. In addition, a new urban street "Pat Salerno Drive" was designed from SR 869 to NW 136th <br /> Ave. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NE 151 and NE 2nd Avenue from NE 5th Street to NE 11 Ih Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> City of Miami, FL 6/2005 2007 <br />e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm <br /> Quality Control Manager - This project in the a heavily urbanized section of downtown Miami included pavement milling and resurfacing, re- <br /> design of two intersections, drainage modifications, permitting, pavement marking and signing, signal modifications, utility coordination and <br /> RR coordination. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.