|
<br />I
<br />
<br />I
<br />
<br />E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one section E for each key person.)
<br />13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Senior Environmental a. TOTAL b. WITH CURRENT FIRM
<br />ScientistlPermittin 14 8
<br />
<br />12, NAME
<br />
<br />I
<br />
<br />Cristy Boyd
<br />
<br />I
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Berger Avart, Inc., Miami, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />SA, Environmental Science, 1993/Graduate Studies in
<br />GeoiD 1994
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />I
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES I CONSTRUCTION lif applicable
<br /> SOUTH FLORIDA MELAEUCA MAPPING PROJECT T
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
<br />a. Research Assistant. Created a time series analysis of melaleuca invasion consisting of several thousand acres of land located south of
<br /> Lake Okeechobee. Utilized color-infrared satellite imagery and transfer scopes to map native versus non-native vegetative
<br /> communities. Maps were ground-truthed by helicopter. Data produced was utilized to determine methodologies to combat this invasive
<br /> species.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> ENVIRONMENTAL PERMITTING AND MITIGATION FOR BAYWINDS, 600 PROFESSIONAL SERVICES I CONSTRUCTION if applicable
<br /> ACRE RESIDENTIAL DEVELOPMENT I
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager. The project entailed obtaining ACOE dredge and fill and the necessary state permits for wetland impacts to
<br />b. develop a site located in western Palm Beach County, Florida. Permitting involved extensive coordination with the U.S.
<br /> Environmental Protection Agency and the U.S. Fish and Wildlife Service to address potential impacts to the federally threatened
<br /> Everglades Snail Kite. Subsequent to issuance of permits, responsibilities included the preparation of bid documents and handling
<br /> O/A meetings with potential contractors. Other responsibilities included monitoring water quality and exotic species removal and/ or
<br /> herbicide treatment on the 300-acre mitigation wetland preservation area. Client: Lennar Florida Partners.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PROFESSIONAL SERVICES T CONSTRUCTION (if applicable
<br /> SOUTH DADE MITIGATION BANK I
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />c. Environmental Specialist. Assisted in preparing the South Dade Mitigation Bank Permit Application to be submitted to the ACOE and
<br /> the Florida Department of Environmental Protection. Specific documents prepared included monitoring, management, exotic species
<br /> eradication plans and listed species assessments to address the Florida panther and numerous avian species indigenous to
<br /> southern Florida. Also prepared a fire management plan for controlled burning. Client: Florida Power and Light.
<br /> (1) TITLE AND LOCATION (City and State) 12 YEAR COMPLETED
<br /> LAKEVIEW ESTATES, A 300 ACRE RESIDENTIAL DEVELOPMENT, LAKE PROFESSIONAL SERVICES I CONSTRUCTION (if applicable
<br /> WORTH, FLORIDA I
<br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm
<br />d. Project Manager. Re-evaluated wetland mitigation plans for this project which was under enforcement action from the U,S. Army
<br /> Corps of Engineers. Responsibilities included re-designing the permitted mitigation plan (in the field) to allow for unanticipated site
<br /> conditions, supervision of re-contouring existing, inappropriate surface elevations, re-planting of native species and correctly re-
<br /> installinQ improperly placed erosion barriers. Client: Gold Coast Homes, Inc.
<br /> (1) TITLE AND LOCATION (City and State) 12l YEAR COMPLETED
<br /> SANCTUARY COVE-INTRACOASTAL WATERWAY, PALM BEACH PROFESSIONAL SERVICES I CONSTRUCTiON (if applicable
<br /> GARDENS, FLORIDA I
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />e. Project Manager. Oversee mitigation activities for a residential development located on the Intracoastal Waterway, in Palm Beach
<br /> Gardens, Florida. The project involved conducting seagrass surveys, daily turbidity and manatee monitoring, supervision of
<br /> construction activities such as canal dredging, the installation of shoreline protective barriers including rip-rap and floating turbidity
<br /> curtains. Additionally, Ms. Boyd supervised the installation of mangrove plantings for shoreline stabilization. Client: The Olen
<br /> Company.
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
<br />I
<br />
|