My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Berger Avart, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:00 PM
Creation date
8/15/2008 1:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I. <br /> <br />I <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br /> <br />I <br /> <br />20. <br /> <br />EXAMPLE PROJECT KEY NUMBER: 5 <br /> <br />21. <br /> <br />TITLE AND LOCATION (City and State): Washington Avenue Streetscape Master Plan <br /> <br />22a. YEAR COMPLETED - PROFESSIONAL SERVICES: <br /> <br />I <br /> <br />22b. <br /> <br />YEAR COMPLETED - CONSTRUCTION (If applicable)' <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />I <br /> <br />23a. <br /> <br />PROJECT OWNER: Miami Beach Public Works Department <br /> <br />23b. POINT OF CONTACT NAME: John De Pazos <br /> <br />I <br /> <br />23c. <br /> <br />POINT OF CONTACT TELEPHONE NUMBER: 305 673-7080 <br /> <br />24. <br /> <br />BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): <br /> <br />I <br /> <br />A streetscape beautification project in the heart of the Miami Beach Art Deco District. The design and construction process for this <br />project, presently ongoing, includes an exhaustive community consensus-building process, historical analysis, site analysis, <br />development of Opportunity/Constraint maps, Alternative Design & Phasing Plans, Final Design/Cost Estimate Plan, and <br />Construction Documents/Administration. <br /> <br />I <br /> <br />Services: Master Plan, Schematic Design Plans, Design Development, Construction Documents and Construction Phase Services. <br /> <br />Project Cost: $3,300,000 <br /> <br />I <br /> <br />~ <br /> <br /> <br />-. , '_ ~ . -:.6' , ... ~' ,.-..- ".,' ..J <br /> <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />I <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects <br /> <br />I <br /> <br />I <br /> <br />STANDARD FORM 330 (6/2004) PAGE 11 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.