My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Berger Avart, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-03) Prof. Eng. Consult for Collins Avenue Streetscape
>
Responses
>
Berger Avart, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:00 PM
Creation date
8/15/2008 1:43:22 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Eng. Consult for Collins Avenue Streetscape
Bid No. (xx-xx-xx)
07-07-03
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) <br /> <br />20. <br /> <br />EXAMPLE PROJECT KEY NUMBER: 10 <br /> <br />21. <br /> <br />TITLE AND LOCATION (City and State): Southeast Normandy Isle Roadway Improvements <br /> <br />22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 1996 <br /> <br />22b. <br /> <br />YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />23a. <br /> <br />PROJECT OWNER: Zyscovich <br /> <br />23b. POINT OF CONTACT NAME: Bernard Zyscovich <br /> <br />23c. <br /> <br />POINT OF CONTACT TELEPHONE NUMBER: 305371-5222 <br /> <br />24. <br /> <br />BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost). <br /> <br />The plan consisted of streetscape planting and paving on three streets in Normandy Isle. A small park is located near the center of <br />the neighborhood, which is a simple, grass lawn encircled by flowering trees. Large canopy trees were specified for street trees to <br />increase pedestrian comfort and improve the neighborhood's character. A median is created along one street with a heavy planting <br />of palms. <br /> <br />Services: Schematic drawings for planting, tree island location, median alignment, and Construction Documents for planting plans, <br />specifications. Construction Observation. <br /> <br />Project Cost: $1,100,000 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects <br />Consul-Tech Engineering Miami, Florida Principal Firm <br /> <br />STANDARD FORM 330 (6/2004) PAGE 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.