Laserfiche WebLink
<br />- <br /> <br />- <br /> <br />e <br /> <br />Example Proiect Kev No.6 <br /> <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Structural Services N/A <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME Ic POINT OF CONTACT TELEPHONE NUMBER <br /> Miami Dade Transit Mr. Surinder Sahota 305-375-4504 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br /> The design of all on-site and off-site improvements including a new interconnect fire water main servicing the local public <br /> areas adjacent to the South Miami Metro Rail Station. The project included on-site drainage system which can handle <br /> runoff from a 10 story building on a restricted site without temporarily flooding or affecting public transportation facilities. <br /> The site was complex as numerous utilities were located adjacent to the site which were not fully documented. The <br /> contract documents called for careful exploration during excavation so as not to disrupt vital utilities to surrounding <br /> business operations. Traffic maintenance and control were critical as the work involved impact to Sunset Drive, a major <br /> arterial. <br /> Provisions had to be made to include drainage capability for an existing adjacent site which had previously been utilizing <br /> the project site for its storm water runoff. Since the whole site is subject to heavy pedestrian volumes, drainage was very <br /> critical as any minor ponding would result in a great inconvenience to users of the Metro Rail Station facility. <br /> Demolition of the existing site was also complex in that the existing drainage had to be removed while still accommodating <br /> the runoff from the adjacent facilities. Since the site was limited additional provisions had to be made for earthwork and <br />fill stockpiling so as not to impact public right-of-way. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Pistorino & Alam Consulting 7171 SW 62nd Avenue Structural Engineers <br /> Engineers, Inc. Miami, Florida 33143 <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) Page 10 <br />