My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CMF International Group, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
CMF International Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2010 4:24:01 PM
Creation date
8/28/2008 10:57:00 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />- <br /> <br />e <br /> <br />Example Proiect Kev No.6 <br /> <br /> F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br /> QUALIFICATIONS FOR THIS CONTRACT NUMBER <br /> (Present as many projects as requested by the agency, or 10 projects, if not specified. <br /> Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br /> South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Structural Services N/A <br /> 23. PROJECT OWNER'S INFORMATION <br />a. PROJECT OWNER I b. POINT OF CONTACT NAME Ic POINT OF CONTACT TELEPHONE NUMBER <br /> Miami Dade Transit Mr. Surinder Sahota 305-375-4504 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) <br /> The design of all on-site and off-site improvements including a new interconnect fire water main servicing the local public <br /> areas adjacent to the South Miami Metro Rail Station. The project included on-site drainage system which can handle <br /> runoff from a 10 story building on a restricted site without temporarily flooding or affecting public transportation facilities. <br /> The site was complex as numerous utilities were located adjacent to the site which were not fully documented. The <br /> contract documents called for careful exploration during excavation so as not to disrupt vital utilities to surrounding <br /> business operations. Traffic maintenance and control were critical as the work involved impact to Sunset Drive, a major <br /> arterial. <br /> Provisions had to be made to include drainage capability for an existing adjacent site which had previously been utilizing <br /> the project site for its storm water runoff. Since the whole site is subject to heavy pedestrian volumes, drainage was very <br /> critical as any minor ponding would result in a great inconvenience to users of the Metro Rail Station facility. <br /> Demolition of the existing site was also complex in that the existing drainage had to be removed while still accommodating <br /> the runoff from the adjacent facilities. Since the site was limited additional provisions had to be made for earthwork and <br />fill stockpiling so as not to impact public right-of-way. <br /> 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a. Pistorino & Alam Consulting 7171 SW 62nd Avenue Structural Engineers <br /> Engineers, Inc. Miami, Florida 33143 <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />c, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.