My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Spillis Candela DMJM # 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Spillis Candela DMJM # 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 4:57:28 PM
Creation date
8/28/2008 11:21:17 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs. for Heritage Park and Parking Garage
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br />.12. <br />3. <br /> <br />14a. <br /> <br />14b. <br /> <br />NAME: BARRY R. GOLDSTEIN, P.E. <br />ROLE IN THIS CONTRACT: PRINCIPAL ENGINEER <br /> <br />YEARS EXPERIENCE - TOTAL: 22 <br /> <br />YEARS EXPERIENCE - WITH CURRENT FIRM: 4 <br /> <br />15. FIRM NAME AND LOCATION (City and Stale): KADERABEK COMPANY, 9565 NW 40TH STREET ROAD, MIAMI, FLORIDA 33178 <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION): BACHELOR OF SCIENCE IN GEOLOGY: 1983, MASTER OF SCIENCE IN CIVil-GEOTECHNICAL <br />ENGINEERING: 1988, PH. D. COURSE WORK GEOTECHNICAL ENGINEERING: 1988-1989 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE): REGISTERED PROFESSIONAL ENGINEER IN THE FOLLOWING STATES: <br />FLORIDA, NEW HAMPSHIRE, MASSACHUSETTS AND MAINE <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): STATE OF FLORIDA CERTIFIED <br />GENERAL CONTRACTOR, AMERICAN SOCIETY OF CIVIL ENGINEERS, DEEP FOUNDATIONS INSTITUTE, SOUTHERN BUILDING CODE <br />CONGRESS INTERNATIONAL AND NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS. <br /> <br />19a(1) <br />19a(2) <br />19a(2) <br />19a(3) <br />19a(3) <br />19b(1) <br />19b(2) <br />19b(2) <br />e9b(3) <br />19b(3) <br /> <br />19c(1) <br />19c(2) <br />19c(2) <br />19c(3) <br />19c(3) <br />19d(1) <br />19d(2) <br />19d(2) <br />19d(3) <br /> <br />19d(3) <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and Slate): THE SAIL BUILDING, MIAMI, FLORIDA <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: JANUARY 2005 <br /> <br />RElEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: MONITOR AUGER CAST PRODUCTION <br />PILE INSTALLATION. <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: YES <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and State): UNIVERSITY OF MIAMI-CONVOCA TION CENTER, MIAMI, FLORIDA <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: DECEMBER 2002 <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size. cost elc.) AND SPECIFIC ROLE: SUBSURFACE EXPLORATION, GEO- <br />TECHNICAL ENGINEERING, SOILS TESTING AND CONSTRUCTION MATERIALS TESTING. <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: YES <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and Slate):OCEAN PALMS CONDOMINIUMS, HOLLYWOOD, FLORIDA <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: OCTOBER 2005 <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost ete.) AND SPECIFIC ROLE: SUBSURFACE EXPLORATION, GEO- <br />TECHNICAL ENGINEERING, SOILS TESTING AND CONSTRUCTION MATERIALS TESTING, MONITOR PRODUCTION PILE INSTALLATION. <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: YES <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and Stalo): 1800 CLUB.FOUNDA TION CONSTRUCTION, MIAMI, FLORIDA <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: SEPTEMBER 2005 <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: 4 SOILS TEST BORINGS, PENETRATION <br />TESTS, SOIL/ROCK SAMPLES CLASSIFIED AND STRATIFIED BY GEOTECHNICAL ENGINEER, TEST EXCAVATIONS, MONITOR <br />AUGER PILE INSTALLATION. <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: YES <br /> <br />1ge(1) <br />1ge(2) <br />1ge(2) <br />1ge(3) <br />ge(3) <br /> <br />RELEVANT PROJECT - TITLE AND LOCATION (City and State).'RELATED LOFTS ONE, MIAMI, FLORIDA <br />RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: DECEMBER 2005 <br /> <br />RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): <br /> <br />RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost ete.) AND SPECIFIC ROLE: EXPLORATION IN MORE DETAIL THE <br />SUBSURFACE CONDITIONS AT PROJECT SITE. MATERIALS WERE EVALUATED TO DETERMINE ENGINEERING CHARACTERISTICS. <br />RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: YES <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.